Kongsberg, Viken, Norway
Accomplished Senior Engineer with over 20 years’ experience in project execution, project management and product design across a wide range of sectors including oil and gas, automotive and semiconductor engineering fabrication. Successfully executed 10+ SPS and SURF scope EPC/iEPCI projects, engaged on handling FEED, system definition, product design, project engineering, fabrication, testing loadout, Transportation and installation. Leads and motivates committed teams and contractors throughout the projects, ensuring delivery within quality, specification and deadline expectations. Reviews designs for feasibility and oversees supplier delivery to specifications. CORE COMPETENCIES Team Leadership | Analytical | Decision Making | Mentoring | Proactive | Studies and Front End/FEED | Evaluation and Selection | Project Engineering | Mechanical Design | EPCI project Execution | Project Documentation | Loadout/transportation | Installation/mobilisation | Quality Control | Supplier/Customer Engagement | TECHNICAL SKILLS PLM/ERP: TCE, SAP, Oracle, IFS, ProArc CAD: Creo/Pro-E,NX, AutoCAD, Inventor, Solidworks, Solid Edge Other: MS Word, Excel, PowerPoint, Outlook & Project; Adobe Acrobat, Photoshop and Illustrator Standards: ISO13628 (1,4,6,7,8,9,15); ASME 13.8, 13.3, 16.9; DNVGL (ST-E271/273); API 17A; SAE AS4059 NORSOK M-001/101/120/501/503/601/630, N-001/003/004 & U-001, R- 001/002/003 PROJECT MANAGEMENT SKILLS Project management | People Management | Product Management | Progress Management | Process Management | Interface Management | Risk Management |
• Handled multiple projects in Front end engineering design and Feasibility studies as Study Lead • Managed the umbilical work package studies for Equinor’s Wisting Reshape and Bay Du Nord. The studies involve on developing a innovative system solution with various alternatives and objective to reduce carbon footprint, accommodate future options, reliable solutions, future technologies with many potential qualifications programs. • Managed umbilical work package feasibility study for AkerBP on electrification of Skarv FPSO by identifying various alternatives and cases to use the Skarv wind turbines for generating power that can be transported to Skarv FPSO with an objective to reduce carbon emissions. • Managed a select study for Aker BP for Øst Frigg field development. • Managed a FEED for ENI for Zhor field development. • Handled a diversified team with close collaboration and effective communication management and continue to follow and monitor the progress of the studies. • Demonstrate ability to handle the conflicts within the team that arises during technical brainstorming and selecting the best solution in alignment to project and company objectives. • Follow Adaptive project management approach due to its high degree of uncertainties and iterative nature as the studies involves evaluating various cases and options and concluding best possible solution. • Evaluate the requirements carefully and develop a requirement matrix describing the contractual obligation and constraints. • Perform concept design reviews with client and stakeholders presenting various solutions that suits client need and ensure all requirements are captured. • Responsible to write the study report for various alternatives and cases
Manage and coordinate with interfacing external stake holders, Inhouse umbilical manufacturing department, Managed changes and variations and resolved technical queries, technical deviations, quality notifications and variation orders. Providing project inputs to test engineers, involving, and participating in verification tests (full scale fatigue test, tensile test, bending test, combined torque balance and tension test, bend stiffener test, friction factor test, and FAT, EFAT and post loadout test. Engineering responsible and support umbilical production, termination interface, termination assembly, sea fastening and loadout, Support project and production planning, procurement, quality, HSE, risk management and cost controller, document controller.
Worked on Equinor’s Statfjørd Øst platform C FLX(Field life extension) project Scope of work involves with engineering and installation task with demolition and modification of pipelines, instruments and platform for replacing water injection with Gaslift line, Compressor re bundling for increasing efficiency and installation of risers. Lead project team and secure interface between engineering, procurement, work preparation and mechanical check Responsible for Installation and Operations of Risers with installation activity sequence and responsibility Coordinate with client representative with responsibility for system interface using Interface management (PIMS), Identify Evaluate-mitigate risk using Risk management (PIMS) Responsible for project plans and progress, Variation order with cost estimation, project CTR, Deviation request, MEL Establish and maintain engineering activities and procurement schedule Execute the project in compliance with the agreed Project Execution Model (PEM) and Contribute to engineering KPI Solving multidiscipline problems and supporting engineering manager with all the engineering execution tasks and follow with discipline leads
Leading diverse, multidisciplinary teams on products and work packages for - flow control structures, foundations, manifolds and modules Supporting system engineering on scope, ROV access, schematics, integration testing, tolerance stackup, spare parts philosophy, interface matrix, rental tool scope, ITP, MEL and risk identification using RISK matrix, RCA, HAZID and HAZOP and Risk Evaluating using FMECA Supporting tender and FEED, technical clarification and coordinating contractual preparation. Working on CGLP & Platina (BP), Cassiopea & Block15-06 (ENI), Tor II & Ekofisk VC (ConocoPhillip), ODA (Centrica), Baobab (CNR) and Johan Sverdrup (Equinor) Defining scope of work and converting the customer requirement to functional products Coordinating engineering and support functions from GEC’s to ensure accuracy and meet requirements Coordinated with interfacing product departments: Intervention and Connections(IC), Tie-In, WellHead(WH), Xmas Tree (XT) and Tooling Managing performance to meet and exceed expectations, training and mentoring to develop skills Performing concept and basic design calculations, estimating efforts, making proposals and managing projects Conducting periodical design reviews, approving or rejecting all engineering and fabrication documents Overseeing all P&ID's, product specifications, test and installation procedures, technical and service documents Collaborating with other work packages, customer, supplier and project support Managing changes and variations and resolving technical queries, quality notifications and variation orders Monitoring and supporting suppliers at every stage of fabrication with engineering clarifications and handled supplier documents like SMDR, MRB Witnessing EFAT,FAT HFT and interface testing, and also engaging in and coordinating testing preparations Supported Installation contractors with Engineering clarification, lifting and Installation mobilisation and Transportation analysis
Headed a diverse team on design of products and work packages for subsea umbilicals on Bonga NW (Shell) and Gorgon Jans (Chevron) Managed performance to meet requirements and milestones and also supporting purchasing and planning Performed concept and basic design calculations, estimated efforts, made proposals and managed projects Provided periodical design reviews, approving or rejecting all engineering and fabrication documents Handled all product specifications, test and installation procedures, technical and service documents Coordinated with other work packages, customer, supplier, project support and installation contractors Coordinated with interfacing product departments: Intervention and Connections(IC), Tie In and Tooling Managed changes and variations and resolved technical queries, quality notifications and variation orders Supported and oversaw suppliers at every stage of fabrication and installation with engineering clarifications, Witnessed testing, also engaging in and coordinating preparations, Handled SMDR, MRB and Dossiers Supported Installation team with Engineering clarification, Installation procedure, Umbilical Reeling, Loadout, Transportation analysis and Installation mobilisation