Joe Moser

Geologist

Greater Seattle Area

About

Experience

  • Geologist at Retired
    Jan 2016 - Present · 10 yrs 6 mos

    Happily retired in the Great Pacific Northwest. Busy setting up my rock shop.

  • Development Geologist -- Deepwater Borneo at ConocoPhillips
    Oct 2010 - Dec 2015 · 5 yrs 3 mos

    Field development planning and execution in the deepwater Gumusut and Malikai Fields of NW Borneo. Seconded to Shell Malaysia deepwater projects group. Primary duties include well planning, containment studies, deep water well integrity and operations. — Provided Subsurface Drilling support for the bottom hole sections in 11 Gumusut Wells. — Planned and designed two gas injection wells for Gumusut Field. — Served as subsurface well delivery lead for 12 Malikai wells.

  • Development Geologist at Qatargas -- ConocoPhillips
    Jan 2006 - Sep 2010 · 4 yrs 9 mos

    Seconded to Qatargas 34, a joint venture with ConocoPhillips & Shell — Subsurface Team Lead for Platform 7 in the North Field, Qatar. The North Field is the largest non associated gas field in the world. — Planned and Drilled 10 Development Wells and an Appraisal Well — Team lead for a multidisciplinary team & liaison with Drilling Team to develop a proactive “Red Well” design that was approved by Qatar Petroleum.

  • Geologist at Conoco Phillips -- Venezuela
    Dec 2002 - Jan 2006 · 3 yrs 2 mos

    Exploraton/Appraisal in Gulf of Paria

  • Geologist -- Chief Geologist at Conoco Canada
    Sep 1997 - Dec 2002 · 5 yrs 4 mos

    Exploration in the Canadian foothills thrust and fold belt. Principal work in the Grande Cache area.