New York City Metropolitan Area
Designed 7,900 feet of Electrical Distribution System power lines and supported 4 pads (Gas lifting, E-rigs) and 2 facilities in the Delaware Basin, incorporated fiber in the plan. Constructed ETAP models and run simulations to verify power flow and protection coordination. Developed Electrical Isolation Procedure (EIP), dig plans, and Construction Work Packages. Ensured all designs compliance with industry and company standards such as E-rigs specific standards and Saltwater Disposal Well (SWD) injections. Conducted field visits to oversee the design and installation logistics of power lines, fuses, transformers. Engaged with field representatives, contractors, and the crew to discuss Right of Way (ROW) options and structure positions using KMZ files.
Participated in the 2020 Construction Industry Round Table (CIRT) Competition