Rotterdam and The Hague
2019-2022 Mero 1 Deepwater Field Development (Brazil) Installation of Mero 1 FPSO Guanabara mooring spread consisting of: - 24x 120t torpedo piles - 24x polyester mooring lines Installation of riser and umbilicals mooring arrangements consisting of: - 11x 35t torpedo piles 2019 TAQA Subsea Protection Dome Removal Removal of 3 subsea protection domes (150t) offshore Scheveningen. 2018-2019 Golar FSRU Nanook (Brazil) Engineering of the complete mooring system transport and installation consisting of: - Anchor Base: 19 m x 19 m x 6m (439 t) - Anchor Piles: Ø 96” x 45 m (137 t) - Yoke Structure: 33 m x 33 m (700 t) - Riser: 14” x 90 m (77 t) - Control umbilical: 138 mm x 95 m (15 t)
2013 – 2014 Turkey-Cyprus Water Supply Project Installation of 126 subsea gravity anchors (200t) including tether and buoy assemblies. 2014 Western Isles Development Project Installation of FPSO mooring piles and ground chains. 12-leg mooring system comprising of: - 12 x 96” Driven Anchor Piles (152t) - 12 x 210m 159 mm Anchor Ground Chain 2014 Ikhwezi Field Development MEG riser replacement at the FA Platform South Africa. 2014 – 2015 Wheatstone Subsea Structures Installation - Manifolds: 3 off, weight range 446t-527t - SSIV: 4 off, weight range 362t -491t - PLET: 6 off weight range 136t-454t - Mudmats: 3 off, weight range 13t -28t 2016 Replacement of Haewene Brim FPSO Mooring System Installation of 8-leg FPSO mooring system consisting of: - 8 x 84”x 25.5 m Driven Anchor Piles - 1,290m of 147 mm Chain 2017 Golar FLNG Hilly Episeyo (Cameroon) Transport and installation of yoke mooring system: - Anchor Base: 19 m x 17 m x 6m (251 t) - Anchor Piles: Ø 96” x 36 m (94 t) - Yoke Structure: 33 m x 33 m (704 t) - Riser: 14” x 85 m (74 t) - Control umbilical: 138 mm x 85 m (15 t) 2017 OWF Arkona Becken Südost Installation of 60 transition piece foundations.