Jason Brewster

Hydro Services Project Manager

Ooltewah, Tennessee, United States

About

I am a pragmatic quick thinking, enthusiastic, task oriented individual. I perform well as a team member while at the same time, excel as an individual. I attempt to align myself with professionals that have strong work ethics, creating a challenging experience and a focus on perfection. My career focus is the maintenance and modernization of hydroelectric powerplants. My experience has included restoration of components, performing inspections, overhauls, routine maintenance, disassembly, rehabilitation/repair, and reassembly. Machining/welding experiences has included tooling set-up, wicket gate line boring, bottom rings, discharge rings, draft tube liners and upper and lower stay rings. Overhaul, disassembly, rehabilitation/repair, and reassembly has included Kaplan, Francis and Pump/Turbine machines. Examples of scope includes, runner replacement, guide bearing replacement/rehab, headcover rehab, wicket gate rehab, wicket gate servomotor rehab, Kaplan runner assembly, Kaplan runner blade servo rehab, wicket gate linkage rehab/replacement, operating ring rehab, thrust bearing rehab, and balance of plant equipment installation/alignment to name a few. Maintenance experience has included diving for intake/discharge gate repairs and inspections, trash rack repairs, and equipment recovery. Representative projects include: Mitchell Hydroelectric Plant Nickajack Hydroelectric Plant Raccoon Mountain Pump Storage Plant Bridgewater Hydroelectric Ocoee Dam Hawks Nest Dam I am a trained commercial diver receiving my certification in Air/ Mix gas commercial diving from Commercial Diving Academy, Jacksonville, FL. I have completed two years of education from Chattanooga State Technical Community College. Other revalant training and certifications include: OSHA 10 Millwright 16 Advanced Rigging Class A Commercial Drivers License HAZWOPER Welding Fork Truck Operations NCCER ACDE Commercial Diver Millwright apprenticeship

Experience

  • Hydro Services Project Manager at GE Renewable Energy
    Oct 2023 - Present · 2 yrs 9 mos

  • Unemployed at Unemployed at this time
    Sep 2023 - Oct 2023 · 2 mos

  • Voith Hydro (Full-time · 2 yrs 3 mos)
    • Service Project Manager
      Mar 2023 - Sep 2023 · 7 mos

    • Lead Technical Advisor
      Jul 2021 - Mar 2023 · 1 yr 9 mos

  • Technical Advisor at Voith Hydro-HyService
    Jul 2020 - Mar 2023 · 2 yrs 9 mos

  • Voith Hydro (8 yrs 4 mos)
    • Site Supervisor
      Apr 2016 - Jul 2020 · 4 yrs 4 mos

      Working as a Site Supervisor in the Corona repair of a 500 MW Pump Turbine.

    • Site Supervisor
      Mar 2014 - Apr 2016 · 2 yrs 2 mos

      Currently working as the site Quality supervisor. Also receiving material for new construction of 3 Bulb Turbines.

    • Millwright
      Apr 2012 - Mar 2014 · 2 yrs

      I was a millwright working at Nickajack dam (vertical Kaplan) and at Raccoon Mountain pump storage (pump Francis).