James Campbell

Mechanical Engineer 4 at Amentum

Chattanooga, Tennessee, United States

About

Experience

  • Mechanical Engineer 4 at Amentum
    Feb 2020 - Present · 6 yrs 6 mos

  • Mechanical Engineer 4 at AECOM
    Apr 2019 - Feb 2020 · 11 mos

  • Maintenance Planner at ERI / AECOM
    Sep 2018 - Mar 2019 · 7 mos

    BGCAPP, Bechtel Parsons Blue Grass Chemical Agent Destruction Pilot Plant Mechanical Startup/Systemization Planner • Develop modification work packages for mechanical installations and piping systems for Startup/Systematization based on change requests, deficiency reports, existing design documentation, P&ID’s, Isometric drawings, site specific procedures & databases. o Mechanical piping for LSS, Fire Protection Systems, Drain Lines • Material selection for field implementation based on design & procedure, verification of material on hand for work, & provide material information to procurement for purchase and scheduling as required. • Design of spill containment & PVC piping run & supports for hose attachment to allow operations drain to local sump or outside. • Develop Hydraulic/Pneumatic Pressure Test & System Flush work packages for Startup/ Systematization. o P&ID mark up for test or flush boundary outline o Valve line up documentation o Temporary modifications to system o Isometric Drawing mark up for test or flush and restoration o Torque selection for flanges to restore system o Pneumatic test calculations and safety outline selection • Coordinate with design engineering, procurement, inspectors, management, document control, safety, operations, maintenance, and craftsmen.

  • Engineer III at POWER Engineers
    Jun 2014 - Nov 2014 · 6 mos

    TVA Watts Bar Unit 2 Construction Completion Project Field Engineer in HVAC, Work Order Closure, Problem Evaluation Reporting, & Mechanical Construction I & C • Organizational management of work orders from implementation through closure • Work order revision to include additional project scope • Implemented changes to drawings and design specifications through AutoCAD o ASME Section III piping interface with steam generator o Small Bore Piping & Tubing Hangers o Instrumentation Panel drawings o Isometric Piping layout with Hanger Locations o Piping and Hanger Weld maps o Compression fitting connection map • Technical writing of field change requests with drawing changes • Material tracking from purchase to final installation • Provided inspection for quality related TVA specific installations o Drain lines o Control Air lines o Valves o Piping & tubing installation o Compression fittings • Coordinated with other engineering departments, inspectors, document control, and craftsmen • Unescorted access at a nuclear power generation facility. TVA Watts Bar Unit 2 Construction Completion Project Lead Field Engineer for Mechanical Construction I & C • Managed the work orders and drawing changes of other Project Field Engineers and reporting progress to management. TVA Nuclear Procurement Specification consolidation from ASME BPVC II/III Code and ASTM standards 1995/A96 to approved NRC code 2007/A08 or later with approval. TVA Nuclear Procurement Specification revisions and consolidation from ASME II and III Code and ASTM standards addenda 1995/96 to approved NRC code addenda 2007/08 or later with approval of client.

  • Engineer I / Engineer II at Burns and Roe
    Jun 2011 - Jun 2014 · 3 yrs 1 mo

    TVA Watts Bar Unit 2 Construction Completion Project Field Engineer in HVAC, Work Order Closure, Problem Evaluation Reporting, & Mechanical Construction I & C • Organizational management of work orders from implementation through closure • Work order revision to include additional project scope • Implemented changes to drawings and design specifications through AutoCAD o ASME Section III piping interface with steam generator o Small Bore Piping & Tubing Hangers o Instrumentation Panel drawings o Isometric Piping layout with Hanger Locations o Piping and Hanger Weld maps o Compression fitting connection map • Technical writing of field change requests with drawing changes • Material tracking from purchase to final installation • Provided inspection for quality related TVA specific installations o Drain lines o Control Air lines o Valves o Piping & tubing installation o Compression fittings • Coordinated with other engineering departments, inspectors, document control, and craftsmen • Unescorted access at a nuclear power generation facility.