Jaco Kruger

Certificate in Modern Risk/SHEQ Management at IRCA Global

Pretoria, Gauteng, South Africa

About

Experience

  • Technical Manager at Averda
    May 2024 - Present · 2 yrs 2 mos

  • Health Safety Environment Officer at PetroMan
    Oct 2019 - May 2024 · 4 yrs 8 mos

  • Wasteman Holdings (Pty) Ltd (Klerksdorp, North-West, South Africa)
    • Plant Manager
      Dec 2013 - Aug 2016 · 2 yrs 9 mos

      Responsible for medical waste incineration facility operating according to legislation set out in the NEM Waste Act No. 59 of 2008 Auditing of the Waste Management Licence conditions that was set out by the department of environmental affairs Managing productivity and stock control of facility Managing safety, health and environmental aspects of the facility Annual budget planning and reviewing of the budget during the course of the year Planned and executed routine maintenance shutdowns at the facility

    • SHEQ Officer
      Jan 2011 - Nov 2013 · 2 yrs 11 mos

      Internal training and induction training to all employees, contractors and visitors entering the facility. Hazard identification and Risk assessment at the facility. Updating and implementing health and safety procedures regularly. Held and updated safety files for contractors working at the facility. Issuing permits to work for: Working at heights; Entry and working in confined spaces; Working with hazardous materials; Hot work and open flames; Lock out procedures; etc. Set up a SHEQ committee and held monthly meetings Audited the emergency evacuation plan and arranged for drills twice a year (once a year with the fire department)

  • Construction Site Manager at Jem Contractors
    Oct 2009 - Dec 2010 · 1 yr 3 mos

    Manage 3 to 4 building sites across South Africa. Labor related queries. Building according to engineers drawings. Planning each site and controlling according to the budget. Health and Safety.

  • Site Supervisor at Blignaut Francis Raft Foundations
    Aug 2007 - Sep 2009 · 2 yrs 2 mos

    Building concrete slabs and raft foundations according to engineers drawings. Managing laborers and stock to get maximum production.