Ives Huang

Realtek Project Manager

Hsinchu City, Taiwan, Taiwan

About

I am a highly experienced, solutions-oriented professional with 10+ years of impressive background in developing software. Proficient in software architecture design and utilizing a wide variety of programs and tools in Linux system to provide high-quality and cost-effective applications/systems to boost organizational efficiency and productivity

Experience

  • Project Manager at 瑞昱半導體股份有限公司
    Aug 2020 - Present · 6 yrs

    Lead 3 RDs to develop switch MAC protocols. 1. Handling design/test/GUI spec design and developing SDK & FW. 2. Verify SYS/HW functions of ASIC/FPGA. 3. Improve the ASIC/FPGA verification performance more than 50% by design-in testing automation. 4. ZeBu planner, instead of FPGA, emulator ZeBu could help a ton of time-saving (~30%) after design-stage.

  • Technical Manager at A&W
    Sep 2019 - Aug 2020 · 1 yr

    Lead 4 RD to develop wireless software SDK. 1. Ponder over a new SDK architecture and implement it in 3 months, speed up the POC date. (SDK designer). 2. Unit all RDs to develop the miracast SDK product by cooking APP, SDK libs, and protocol. 3. Quickly integrate the chip vendor Linux-based platform (MTK, Telechips, JK, ST) into build server for team easy developing and reduce ~50% environment building time. 4. Build up software svc/build server (Team Building).

  • Project Manager at D-Link
    Jul 2018 - Aug 2019 · 1 yr 2 mos

    Lead 2-4 RDs to develop swtich NOS(Network OS) system. 1. Porting switch NOS from Linux-based OS to windows-based simulator and get it works in 1 month. 2. On-site support DJP (D-Link Japan) business partner one month and make a good communication to get switch issue to be clarified between RD & partner.

  • Assistant Manager at TwinA
    Jan 2018 - Jul 2018 · 7 mos

    1. Handle switch protocols such as ACL, QoS, AAA. 2. Discuss and design TwinA proprietary NOS system. (CLI, SDK)

  • Senior Engieneer at EstiNet
    Mar 2016 - Jan 2018 · 1 yr 11 mos

    Lead 2 RDs. 1. Improve the control flow of VLAN, bridge-domain, and switch-port, and eliminate ~80% of potential system issues. 2. Develop & provide MC-LAG(Multi-Chass LAG) protocol POC in MTK IDC. (Customer Acquisition). 3. Build a new HTTP Web GUI with members in 2 months for DaTang and get their purchase order. approval. (Customer Acquisition) 4. Resolve ITRI switch deployment issue in 2 weeks to meet their deadline for demo for China customers. (Problem-solving, Pressure resistance) 5. Integrate PAM, ZTP, DHCPC, CA-Key and Mgmt Port into Linux-based OS.