Ian Mackinnon

Revizto Customer Success Manager - Linear Infrastructure #empowering-innovation

Greater Melbourne Area

About

An experienced BIM Manager/Coordinator/3D Modeler striving to utilize the benefits that BIM/DIM processes provide for value engineering, cost savings, and safer projects through Virtual Design & Construction (VDC), coordination and visualization.

Experience

  • Revizto (Melbourne, Victoria, Australia)
    • Enterprise Industry Consultant - Linear Infrastructure #empowering-innovation
      Dec 2025 - Present · 7 mos

    • Revizto Customer Success Manager - Linear Infrastructure
      Aug 2024 - Dec 2025 · 1 yr 5 mos

      I am excited to share that I have joined Revizto as a Customer Success Manager, focusing on Linear Infrastructure projects. I will be bring my 30+ years of experience (yes I know I am old), into this cutting-edge, collaborative innovative environment to assist and empower current and new users. Are you ready to remove your project's workplace silos? Are you ready to work in a collaborative digital environment to improve efficient project delivery? Are you ready to take your infrastructure or construction project to the next level and ensure it is delivered safely, on time and on budget? Does your project require having the right information, to the right people, at the right time? If the answer is Yes to any of these questions, please email me at [email protected] so we can start the conversation to empower you and your team on how to improve your project delivery. #Revizto #BIM #VDC #Construction #collaboration #AI #VR #ConstructionTech #AEC #AECO #BIM #infrastrtucture #linearinfrastructure #Innovation #TechRevolution #digitaltwins #3dmodelling #engineering #upskill

  • KBR, Inc. (8 yrs 6 mos)
    • Digital Engineering Manager - Victoria
      Apr 2019 - Aug 2024 · 5 yrs 5 mos

    • National Digital Engineering Lead - Principal Technical Professional - Digital
      Mar 2016 - Aug 2024 · 8 yrs 6 mos

    • Digital Delivery Manager (Design)
      Jul 2021 - May 2023 · 1 yr 11 mos

      Comprising KBR, AECOM, John Holland, CPB Contractors, Alstom, Metro Trains Melbourne, V/Line and Rail Projects Victoria, the consortium will upgrade the existing Sunshine station to create a new transport hub connecting airport trains with local and regional rail service. This will include a flyover between Sunshine and Albion Junction, an accessible second pedestrian concourse and new forecourt area at Sunshine Station, and a new forecourt area at Albion Station.

  • Engineering Design System Coordinator / BIM Manager / Senior Structural Civil Designer at WorleyParsons
    Aug 2006 - Mar 2016 · 9 yrs 8 mos

    Vast knowledge in BIM management and was a driving force at Worley Parsons to change their philosophy on deliverables. This philosophy change was to utilise the 3D structural model as our main deliverable instead of it just being a tool to produce our 2D deliverables. The 3D model became our prime deliverable with minimal 2D documents to support it. Worley were able to reduce our 2D output drawings by 75%. The model was delivered and integrated with all other disciplines and we reviewed and clash detected against other disciplines. This also reduces the construction costs as our RFI’s and Site Instructions were also reduced dramatically. All 3D and 2D deliverables utilising the following CAD tools: AutoCAD, MicroStation, PDMS, ProSteel/ProStructures/ProConcrete, PDS, Recap, WiseImage, Inventor, 12D, and NavisWorks.

  • CAD Manager/Senior 3D Modeller & Steel Detailer at Bayside Drafting Australia
    Aug 2004 - Aug 2006 · 2 yrs 1 mo

    IT/CAD Support Manager, Senior 3D Modeller, Steel Detailer, Project Manager, AutoCAD & Prosteel Support

  • 3D Modeller & Steel Detailer at Precision Design Australia
    Dec 2000 - Aug 2004 · 3 yrs 9 mos