Holger Weimer

Technical Manager bei ifm-Unternehmensgruppe

Fürth, Bavaria, Germany

About

Experience

  • ifm (10 yrs 5 mos)
    • Vice President Quality Management System
      Sep 2024 - Present · 1 yr 10 mos

    • Technical Manager
      Apr 2017 - Aug 2024 · 7 yrs 5 mos

      Development of software solutions for condition monitoring, connectivity of industrial devices and more.

    • Project Manager
      Feb 2016 - Mar 2017 · 1 yr 2 mos

  • Hauptabteilungsleiter Technisches Management at ifm software gmbh
    Jan 2018 - Jul 2025 · 7 yrs 7 mos

  • Engineering Manager / Senior Architect at AREVA NP
    Sep 2014 - Jan 2016 · 1 yr 5 mos

    Engineering Manager for a power plant project in Finland with the responsibility for: • Process & Safety Engineering • System Design Engineering • Operating Manuals • Simulator, Human Factor Engineering snd Customer Training Technical Management, Project Management, Customer- and Authority Relations, Management of Project Team

  • AREVA (12 yrs 8 mos)
    • Division Manager
      Sep 2013 - Aug 2014 · 1 yr

      Division Manager with the responsibility for: “Process and Safety Engineering”, management of 4 regional departments:  Radiological Protection, Severe Accidents, Building Analysis  Transient Accident Analysis, Fluid Dynamics and CFD  Safety Engineering  Plant Operating Manuals Operational Management for the regional Division, Interface to WW business unit, Management of the engineering backbone delivering services to projects.

    • Department Manager
      Jul 2011 - Aug 2013 · 2 yrs 2 mos

      Department Manager for “Safety Engineering”, management of 5 sections:  Probabilistic Safety Analysis Level 1 and Level 2  Deterministic Safety Studies PWR  Deterministic Safety Studies BWR  Functional Requirements Safety I&C PWR  Functional Requirements Safety I&C BWR Operational Management for the regional department, Interface to WW business unit, Management of the engineering backbone team, delivering services to projects. Management of scientific computer codes.

    • World Wide Department Manager
      Jun 2009 - Jun 2011 · 2 yrs 1 mo

      World Wide Department Manager for “Processes, Tools and Methods” within the sector plants of AREVA SAS in France • Management of 3 teams located in France, US and Germany • Processes, Methods and Tools for 2D & 3D Design and Material Management Operational Management for the regional department responsible to provide the software tools used by engineering for power plant design comprising of 3D CAD tools and product data management systems. R&D works on PLM integration, Requirements management and data warehousing.

  • Project Engineer at Siemens
    Jun 1996 - Jan 2002 · 5 yrs 8 mos

    Project Engineer for Radwaste Treatment Systems; responsible for the engineering and technical project management in the following projects • MAW Evaporator Research Center Karlsruhe; Size: (0’9 M€) Customer: NUKEM Nuclear, Scope: design and delivery of two HAW evaporator units • Ronvo Centrifuge; (Size  1.500 k€) Customer: TACIS / Rovno NPP; Scope: design and engineering for waste treatment system, preparation of technical proposal, negotiations with customer and international suppliers • Chernobyl Solid Waste (ICSRM); (Size  40.000 k€) Customer: TACIS / ChNPP; Scope: design and engineering for waste treatment systems, preparation of technical proposal, negotiations with customer and international suppliers • Chernobyl Liquid Waste (LRTP); (Size  30.000 k€) Customer: EBRD / ChNPP; Scope: design and engineering for waste treatment systems, preparation of technical proposal, negotiations with customer and international suppliers • SOGIN Plasma Incinerator; (Size  20.000 k€) Customer: SOGIN (Italy); Scope: design and engineering for waste treatment system, preparation of technical proposal, negotiations with customer and international suppliers • Lungmen Radwaste; (Size  100.000 k€) Customer Taipower Corporation; Scope: design and engineering for waste treatment systems, preparation of technical proposal, negotiations with Taiwanese customer and suppliers • KWL Waste Water Treatment Plant; (Size  1.000 k€) Customer: KWL; Scope: design, delivery and commissioning of an evaporator unit for waste water treatment • R&D Works: o Lithium recovery by Membranelectrolysis o Spray Dryer for evaporator bottoms o Reverse Osmosis for radioactive waste water treatment o CSB Reduction in evaporator bottoms by UV-Oxidation o Wet oxidation of organic nuclear waste in supercritical conditions