Hesham HEGAZY

Interface / Coordination Manager for Cairo Metro Projects

Egypt

About

With 30 years overall experience in Rail domain, and assisting in all Cairo Metro Lines 1, 2 and 3 in various disciplines, which developed a demonstrated knowledge in managing and leading the Coordination / Interface for project needs

Experience

  • Senior Interface Manager at Nippon Signal
    May 2022 - Present · 4 yrs 2 mos

    Managing all the Interfaces for Cairo Metro Line 4 concerning the Civil / Electro-Mechanical / Telecom / Rolling Stock / Toll Equipment and Tack works. Supervising the Coordination Works for the same disciplines.

  • Alstom (27 yrs 2 mos)
    • Interface Manager
      May 2019 - Apr 2022 · 3 yrs

      Managing all the Interfaces for Cairo Metro Line 3 Phase 3 and Phase 4 concerning the Civil / Electro-Mechanical / Telecom / Rolling Stock / Toll Equipment and Tack works

    • Coordination Manager
      Apr 2017 - Apr 2019 · 2 yrs 1 mo

      Managing the Coordination between Alstom and Civil / Electro-Mechanical / Telecom / Track works for Cairo Metro Line 3 Phase 3 and Phase 4.

    • Planning Manager
      Jan 2015 - Mar 2017 · 2 yrs 3 mos

      Preparation and follow up for the planning of Main Line Project Beni Suef Assiut and Cairo Metro Line 3 Phase 4

  • Technical Office Engineer at CAMPENON BERNARD
    Aug 1993 - Feb 1995 · 1 yr 7 mos

    Preparing Formwork and Reinforcement drawings for Cairo Metro Line 2 - Phase 1

  • Technical Office Engineer at Jeumont-Schneider - Bauch Telecom
    Apr 1987 - Jul 1993 · 6 yrs 4 mos

    Preparing the drawings for the Automatic Telephony / Direct Telephony/ General Call and Public Address Systems for Cairo Metro Line 1 and Ramses Complex Center