Henry Dinh

GCC Leader - Water Networks

Makati, National Capital Region, Philippines

About

Henry’s experience covers water infrastructure delivery from concept design, through to detailed design and construction phase support. Henry has a strong technical and design management background. He has been the design lead for sewage pumping stations and large diameter pipelines on numerous design and construct contracts and design only contracts. Henry has also held operational roles within GHD having been the Networks team leader in Sydney. Currently, he is establishing the Water Networks GCC based in Manila.

Experience

  • GHD (Full-time · 3 yrs 1 mo)
    • GCC Leader - Water Networks
      Sep 2025 - Present · 10 mos

    • Senior Engineer - Water and Wastewater
      Jun 2023 - Present · 3 yrs 1 mo

      Key Projects SP0224 M&E upgrades: PM and designer for renewal of dry well/ wet well pumping station Castle Hill Compliance : Package lead for the Detailed design of DN750 and DN1000 incoming gravity sewers, DN1000 Discharge Pipeline, DN900 bypass pipeline and various other process pipelines at the Castle Hill WWTP. Design Engineer for the 400L/s UF Pump Station

    • Team Leader - Water Infrastructure (Networks)
      Mar 2024 - Sep 2025 · 1 yr 7 mos

      Team Workload and People Management

  • Senior Engineer - Water at FJA™
    Dec 2022 - Jun 2023 · 7 mos

  • Civil Engineer - Water and Wastewater at GHD
    Feb 2018 - Dec 2022 · 4 yrs 11 mos

    Key Projects: Western Sydney Airport (Site Engineer) Surveillance for the construction of fuel hydrant main, fuel farm and stormwater drainage for the new Western Sydney Airport. M12 Enveloper Pipelines (Designer): Detailed design of 15 off enveloper pipelines crossing for the future M12 motorway, varying from DN600 to DN1350 RCP Class 6 Parkes SAP D&C (Package Lead): Concept and Detailed Design of 2 x Sewage Pump Stations delivering 226L/s and 72L/s, 8km of incoming trunk sewers (DN225-DN600) and 3km of pressure mains (OD280 - OD355) to service a new development in Parkes. Prospect to Macarthur Link (Design Engineer): Detailed design of bulk water transfer between Prospect South to Macarthur involving new Re-chlorination plant, 3.5 km of DN900 transfer main, 150 m of DN1200 pressure main, 300 m of DN450 water main adjustment and typical pipeline details to cater for large diametre pipeworks (D750 to DN1200). South West Growth Area - Eastern Front - Package 3 (Design Engineer): Concept design of water system upgrades in Sydney's southwest including a new water pump station (114ML/d) pumping from Liverpool to Cecil Park and Bonnyrigg reservoirs, a 3.5km DN900 transfer main between Liverpool and Cecil Park Reservoirs and 5.5 km of DN200/300 water supply mains in Austral and Leppington. Wet Weather Discharges in Homes - Package 12 South and 12 West (Designer): Detailed design of sewerage network modifications, emergency relief structures and capacity upgrades, in Granville, Warilla and Leichhardt, to resolve wastewater overflows/ discharges within private property during wet weather events. Leppington and Leppington North Stage 2 Wastewater Servicing (Project Engineer): Detailed design of interim lift pumping station SP1183A (52 L/s), Bonds Creek Carrier Section 2 and Lead-in Sewers (2.6 km) and Bringelly Road Carrier Section 2 and Lead-In Sewers (3.6 km) to service Leppington, Leppington North and Austral.

  • Graduate Analyst at Macquarie Group
    Feb 2017 - Jan 2018 · 1 yr

    Graduate Program - Corporate and Asset Finance

  • Academic Tutor at UNSW
    Mar 2016 - Nov 2016 · 9 mos

    Semester 1 - Engineering Design and Innovation Semester 2 - Environmental Principles and Systems