-Technical director in mega infrastructure projects incl. responsibility for cost, time and quality - Link between technical division and CEO on all political, organisational, technical and economic matters - Preparation for and presentation of progress to board in board meetings over a period of 5 years (approx. 20 mtgs.) in Femern A/S - Preparation of bespoked Design & Build Contracts - Preparation of Build Contracts - Overall responsible for managing of contracts with contractors and consultants, incl. architects - Design of bridges, immersed tunnels and bored tunnels - Preparation of conceptual designs and tender designs - Reviewing and approval of contractors' basic and detailed design - Negotiating contracts into conditional contracts and later prologation of conditional period - Settling of complaints against award of contracts - Organisational preparation for the construction phase including recruitment

Experience

  • Technical Director, Project Development at Sund & Bælt Holding A/S
    Oct 2022 - Present · 3 yrs 9 mos

    Preliminary studies are being undertaken for a fixed road link with a length of approx. 10 km between Als and Funen in Denmark as well as for a storm surge protection project for Copenhagen, Tårnby, Dragør and Hvidovre municipalities with a total coast stretch of approx 45 km. Environmental impact assessments and reporting based on technical description of an immersed tube tunnel partly with cut-and-cover tunnel stretches for an approx. 10 km road tunnel with dual lanes in either directions from Nordhavn to Kastrup in Copenhagen connecting Helsingørmotorvejen in north to Øresundsmotorvejen in south.

  • Head Consultant at Danish Road Directorate
    Jan 2020 - Sep 2022 · 2 yrs 9 mos

    Working as Head Consultant on the Nordhavnstunnel-project - a 1,4 km long 2 x 2 lane road tunnel crossing the harbour entrance at Svanemøllehavnen in the northern part of Copenhagen to a development area for housing and offices. Act of Construction taken by the Danish Parliament on 19 December 2019 giving the administrative approval for the implementation of the tunnel project. Initially consultancy services were procured. Responsible for the procurement and implementation of geotechnical and hydrogeological investigations as basis for the procurement of a Design & Build contract including M&E. Responsible for the development of technical documents for the procurement of Design & Build contract and giving input to all non-technical documents. Restricted EU-tender with negotiations but allowing for award based on first bid, which turned out to be the case. Contract was signed in September 2022 starting a planned 5 years construction period. Responsible for preparatory works including design, procurement and construction of a substitution harbour situated approx. 500m away for 600 pleasure boats to be moved from tunnel site in advance of tunnel construction.

  • Femern A/S (Copenhagen Metropolitan Area)
    • Technical Director
      Jan 2015 - Dec 2019 · 5 yrs

      From January 2015 - August 2016, shared position of Interim Technical Director at Femern A/S, including responsibility for negotiations with the contractors to reduce the indicative prices of December 2014, subsequently to negotiate the conditional contracts and signing thereof. Managing the Technical Department's activities including support to the German plan approval application and enabling works for the production site at Rødbyhavn. From August 2016 - December 2019, Technical Director, Femern A/S, including responsibility for settling of two complaints against the award of the conditional tunnel contracts (contracts price approx. 4 billion Euro (2015)), prolongation of the 3 tunnel and portals contracts with FLC (contractor) and the dredging and reclamation contract with FBC (contractor) with one year, organisational preparation of Femern A/S for the construction phase and finally responsible for the signing og the variation agreement with FBC for the Danish work harbour etc. bringing the Femern Link Project into the construction phase. The organisational link between the CEO and the Technical Division in all political, organisational, technical and economic matters.

    • Contract Director, Portals & Ramps
      Dec 2011 - Dec 2014 · 3 yrs 1 mo

      Contract Director Portal, Ramps and Landworks 2011-2014 at Femern A/S, when the tunnel was chosen as the preferred solution (Eurocode) and the bridge solution became the alternative. Reporting to the Technical Director, responsible for all activities within the contracting area, including finance, time and quality. From 2013-2016 also in charge of advanced activities executed at Rødbyhavn.

    • Project Director, Bridges
      Jan 2009 - Nov 2011 · 2 yrs 11 mos

      Project Director Bridge 2008-2011 at Femern A/S. Approx. 2 years with dual role at Femern A/S and at Citytunnelen. Reporting into the Technical Director at Femern A/S, responsible for all activities, including time, finance and quality in relation to preparation of bridge solutions (Eurocode) in competition with tunnel alternatives. Participated in Sund & Bælt working group ahead of the political decision on a new bridge at Federikssund (Crown Princess Mary's Bridge). Via S&B Partner, assisted management at BDK ahead of the political decision concerning a new Storstrømsbro.

  • Technical Director at Citytunneln
    Oct 2001 - Dec 2008 · 7 yrs 3 mos

    Technical Director in the client organisation for Citytunnelen in Malmø, Sweden from 2001-2010 (construction budget approx. SEK 9 billion (2005)). Responsible for time, budget and technical quality for all 19 contracts that were executed largely as Design & Build contracts, some as Build contracts and one using a partnering model: right from the start of conceptual design, tendering/contracting to implementation and delivery. Headed up a technical department with approx. 40 employees and over 100 consultants. Citytunnelen opened on time and 10 % under budget.

  • Design Manager, Bridge at Øresundsbro Konsortiet
    Mar 1994 - Sep 2001 · 7 yrs 7 mos

    Employed at Øresundsbro Konsortiet from 1994-2000 as Design Manager in the client organisation for the construction of the bridge section of the Øresund Bridge (construction budget approx. DKK 6.5 billion (1996)). Right-hand man to the Contract Director Bridge and responsible for the Client's technical communication with the contractor, including responsibility for all consultant activity under the client in terms of architecture and technical design (Eurocode). Responsible for the preparation of tender documents, tender evaluation, contract negotiation and contract signing, the client's point-of-contact in relation to technical communication with the contractor and co-signer in respect of all correspondence on technical aspects with the contractor including claims-handling. In the final phase, responsible Parallel Works Coordinator where the contractors and installation contractors' access to the bridge was optimised to achieve an earlier opening. The bridge opened six months ahead of schedule and on budget.