Greater Hamburg Area
- Product-relevant project execution according specifications - Development and implementation of project specific technical solutions - Customer / supplier contact - Preparation of technical specifications to suppliers - Clarification of interfaces between internal and external components - Creation of documents (e.g. release drawings, assembly and planning instructions, final documentation) - Commissioning and coordination of, et al. development (software clarification), Construction (drawing creation), commissioning, shipping, purchasing - Participation in FAT with class and customer - Accompaniment of commissioning if necessary on site - Handling of warranty cases
- Responable for integration of generators and converters into the wind turbine - Clarification of hardware requirements, guidelines and standards for hardware integration - Creation and review of technical documentation and specification - Prototrype inspection and commissioning of the generator - Review and verification of commissioning tests, system tests, and type tests - Bundled communication to stakeholders and suppliers on technical level in representation of senvion - Execution of Failure Mode and Effects Analysis (FMEA) and implementation of the resultiung measures
- Coordination of grid function fault ride through (OVRT/LVRT) for the wind turbine - Clarification of grid requirements and processing development requests - Grid studies for multiple fault ride through grid function - Implementation grid requirements for the converter specifically reactive current limitation (transient and steady state) - Analysis of fault ride through response based on converter model
- Diploma thesis - Modeling of Outer Corona Protection using finite element method - Analyse steady state and harmonic problems with FEM using ANSYS
- Student Tutor Fundamentals of alternating Current Engineering