Birmingham, England, United Kingdom
Meng in Civil Engineering CSCS Card SSSTS Qualified CISRS Scaffold Awareness Training Medium Risk Confined Space Training Scaffold Tower User Training (PASMA) National Water Hygiene Training Emergency First Aid at Work Training HSG47 CAT & GENNY CITB Temporary works supervisor Street Works Supervisor Training Working towards CEng
Carried out bridge and reservoir tanks inspections Carried out technical drawings for civil structures designs in Autocad Carried out structural assessment works in accordance with CS454 and CS455 Carried out site visits for bridge foundation works and pre pour inspections and rebar checks
I was involved with managing and planning haul road routes, carrying out site checks and setting out the haul road to check for any clashes. Where there are ditches to be crossed, I have prepared and submitted consenting applications to the regulatory bodies. Setting out the location of a piling platform and organised testing for the ground prior to laying stone. I have written various RAMS and also compiler section 61 applications for numerous areas along our site. Carrying out surveys using a GPS and have built a bell mouth to allow site vehicles to access one of the sites.
Responsible with assisting the management of the permanent design of multiple assets along a 13km stretch of railway. The role involved participating in design review and progress meetings. Liaising with third parties such as utility owners and farmers. Manging, answering, technical queries. Reviewing design deliverables. Managing and issuing surveys to the design team, ensuring QA checks had been carried out. Managing the CAT 3 checker who was onboarded and organising progress meetings and delivery of data. I also hade to raise and review outgoing/incoming early warning notices from designers/client.