Harinder Singh Rawthan

Assistant General Manager at Tata Consulting Engineers Limited

Chandigarh, Chandigarh, India

About

Experience

  • Tata Consulting Engineers Limited (13 yrs 5 mos)
    • Assistant General Manager
      Jun 2019 - Present · 7 yrs 2 mos

      Team Lead for 02 Water supply tunnel projects for BMC at Mumbai. The construction of tunnel includes 81m to 110m deep shaft. The construction includes both DBM and TBM methods of tunnel excavation. Thanks

    • Assistant General Manager
      Feb 2017 - Jun 2019 · 2 yrs 5 mos

      Myself a Civil Engineer by profession is a Sr. Hydro expert at TATA Consulting Engineers. Presently holding a position of Assistant General Manager & posted at Kabeli-A HEPP, Nepal since 27th Feb 2017. The project is a World bank/IFC funded with other International stakeholders major like InfraCo Asia, Singapore.

    • Senior Manager
      Nov 2013 - Feb 2017 · 3 yrs 4 mos

      Tata Consulting Engineers Limited is a pioneer consultancy company in India. It provides consultancy in various Power sectors including nuclear, thermal, hydro, wind, solar etc. It is more than 50 years old organization fully owned by TATA Sons. The Project is utilization of the 35 years old Diversion Tunnel into Head Race Tunnel & generate 120MW of power using water from the existing Dam. It includes rehabilitation of the old existing structures & construction of 180.0 m long new HRT, sub- surface Power House, 64.0m deep Surge Shaft , 75.0X 180.0 m Switchyard, 500 sqm Workshop, 45.0 m long Bridge supported on piles & raft foundation on either sides & connecting National Highways to the Bridge.Land restoration before final hand over of the project.

  • Deputy Manager at LANCO
    Jun 2007 - Feb 2013 · 5 yrs 9 mos

    The project is run off the river scheme. The capacity of the project is 2X38 MW on river Mandakani. The project is having 26 m high gravity Dam. Intake structure with 2 de-silting chambers. 9.38 Km long HRT up to bottom of 60m high Surge Shaft. After that there are two Vertical pressure shafts each 50.0 m & 110.0 m deep & two nos. horizontal pressure shafts. Between first HPS & second VPS there is 123.0 m long aligned pressure shaft. The Head is 448m. Discharge is 21 cumecs.

  • Asstt.Manager/ Senior Research Officer QC at Italian-Thai Development PCL
    Apr 2005 - May 2007 · 2 yrs 2 mos

    KOLDAM is 2X400 MW hydro power project situated on river Satluj with 172 m high rock fill Main dam. There are downstream & upstream coffer dams, which are now part of main Dam.It is first hydropower project of NTPC in India. The volume of clay core is 21 lakh cum. The materials used to fill the dam were categories into 10 types. No.1 being clay and No.10 rip-rap. The Project is commissioned & generating Power.