Harbir Singh Sandhu

Infrastructure And Sustainability

New Delhi, Delhi, India

About

Experienced Project Manager with a demonstrated history of working in the hospitality industry. Skilled in Fire Fighting projects, FAS system, Hotel Pre- Opening, Operation Management, and Project Engineering. Strong engineering professional with a Bachelor of Technology (B.Tech.) focused in Mechanical Engineering from Amritsar college of engineering and technology.

Experience

  • Alila Hotels - Two Roads Hospitality, Asia (1 yr 5 mos)
    • Engineering Manager HOD (Pre-Opening)
      Mar 2017 - Apr 2018 · 1 yr 2 mos

      Joined at Project stage, eliminated structural and service related issues and established Energy conservation program. Carry out life safety audits, engineering self audit inspections and fire prevention compliance inspections. Ensure work place health and safety practices are being implemented in accordance with corporate programmes and local laws. Ensure compliances with corporate policies, international standards, local regulations, and other environmental considerations. Budgeting and cost control. Developed & established preventive maintenance and energy conservation programmes for the hotel immediately after the opening.

    • Engineering Executive (Pre-Opening)
      Dec 2016 - Feb 2017 · 3 mos

      Assist new hotels during pre-opening period : assists in training new engineers, assist engineer with establishment of maintenance department for hotel, and assists the engineering department with all aspects of the opening

  • Team Leader-Engineering (Pre-Opening) at Hyatt Regency
    Dec 2015 - Dec 2016 · 1 yr 1 mo

    Responsible for the successful opening of 211 keys on the given date with full inventory. Joined at Pre-opening stage, and hand over taken of entire services and assets.

  • Team Leader Engineering (Pre-Opening Task Force ) at Hyatt Place
    Dec 2015 - Jan 2016 · 2 mos

    Snagging and handover of plant room, guest rooms and public areas. Setup the fire alarm matrix. Worked in Pre-opening with project and successfully done opening of 144 keys.

  • Team Leader-Engineering at HYATT Hotels
    Mar 2013 - Dec 2015 · 2 yrs 10 mos

    Manage the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and electrical systems. Develop a long term plan for preventative maintenance and asset protection; oversee execution of plan Maintain property life safety systems (fire fighting equipment, sprinkler systems and alarm system). Participate in pre- and post-convention meetings to determine specific guest needs, develop action plan and ensures execution of plan by engineering team

  • Team Leader Engineering at Ista Amritsar
    Feb 2012 - Mar 2013 · 1 yr 2 mos

    Responsible for the shift operation and day to day operation of the engineering department.