Doha Metropolitan Area
•IRCA QMS Auditor •Project Management Professional (PMP) •Precast segment ring production and quality control for tunnel lining (C50) • Invert concrete and other miscellaneous works •Preperation of construction and installation quality plans (CIQP) • Preperation of Inspection and Test Plans (ITP’s) •Establishing, implementation and coordination of all quality control works ; • Raw material and material receiving controls • Work inspection requests (WIR) • Site inspections and quality control tests in accordance with related inspection and test plans (ITP’s) • Quality control records in accordance with related inspection and test plans (ITP’s) • Inspection section certificates (ISC) •Preparation of concrete mix designs •Controling the material testing plans •Controling the Industrial Testing Process and Plant Trials •Interface between the production and laboratory teams for the supplied part of the concrete and cement works • Design of steel fibres concrete • Use of powder materials in concrete mixture • Mechanical and physical properties of high/ultra high strength concrete • Mechanical and physical properties of reactive concrete • Mechanical and physical properties of semi-transparent concrete • Some mechanical properties of recycled aggregates • Ballast selection criteria for high speed train project • Selection criteria of tunnel boring machine • Main design parameters of undersea TBM tunnel project • Geotechnical evaluation of tunnel projects • Special design concrete (UHPC, RPC, GFRC) • Earthquake • Liquefaction risk analysis • Bored piles and pile axial loading tests • Evaluation of physical and engineering properties of core samples • Geotechnical investigation • Tunnels, subsea tunnels, NATM
Al Khor Expressway Project
Avrasya Tüneli Projesi