Istanbul, Istanbul, Türkiye
In order to gain a vision during her undergraduate education, she actively participated in various activities from 'World Architecture Congress' to 'Home Construction Workshop from Straw Bale'. Besides she has worked as intern at various architectural offices in Turkey and abroad. NSMH is one of them in which she had the chance to work with Nevzat Sayın in the design process of The Seed Concert Hall project. After completing her undergraduate education in 2009, she worked in various interior design firms and gained sectorel experience in customer relations, cost calculations and production follow-up. In the same year, she continued her research studies on Ecologic Buildings at ITU Environmental Control and Construction Technologies postgraduate programme. In 2011, she took part in the design and application project processes of various projects including Sisli Municipality Building at Boran Ekinci Architecture Office. Then she became team leader in the Oman International Airport Construction field design team as a member of Bechtel & ENKA partners. Since 2013, she has been working as an architectural project leader in the team where all disciplines work together with BIM system in BOLD Design Office. In 2019, she has been graduated from master program at ITU with her thesis "A Research for Development of National Building Information Modelling Library Content In Line with Sectoral Needs: The Case of Doors". Now then - in the digitalized world - she continues to work on architectural projects and researches such as BIM System, Generative Design, Integrated Design, Ecologic Buildings and Energy Performance Assessment in Buildings.
BOLD is a team having members from all disciplines using BIM systems to develop projects. I have such responsibilities on those projects : - Teknopark İstanbul Office Buildings (2018-2019) BIM project management over BIM360 platform and modelling from conceptual design to construction documentation - İstanbul Healthcare Administration Building (2015-2016) From conceptual design to construction documentation; Responsible for managing the detail design and coordination modelling and production of sheets and schedules for permit and construction documentation (all drawings and calculations made in Revit model) - Şişli mixed use project (2015) Conceptual design; Responsible for managing conceptual design 3D modelling and preparing sheets from that model for municipality approvals - Okmeydanı & Göztepe Hospital (2015) Design control and coordination; Responsible for making system families to use in coordination model having all information given in bidding documents - Ercan Airport Project (2013-2015) Conceptual and detail design; Responsible for making 3D model of two parts of airport using BIM systems and sheets from that model as construction documents
Development of Muscat International Airport Forecourt&Car Parking Buildings Maintenance Yard Buildings responsible for design coordination & shop drawings
2D conceptual drawings by using CAD programs, plot the drawings and make revisions according to the conversations with customer 3D conceptual design by using CAD programs, preparing visual presentation and making revisions according to the conservations with customer 2D detail drawings by using CAD programs in charge of coordination of all disciplines to prepare construction projects of the designed building such as civil engineer, electrical engineer, mechanical engineer etc. projects worked for; Şişli City Hall Project - Detail Design Suadiye Apartmant Block - Conseptual Design Kırşehir Sanitary Landscape & Mosque - Conseptual Design Block House - Conseptual Design
Sales management by direct relationship with customers Designing of children’s room after the conversation with customer according to their needs and choices by using the furniture parts in Vibel system and other supplier firms’ productions such as wallpapers, fabrics and lighting elements Preparation of bid according to the used Vibel parts by using accounting programme called 4D for Vibel Shop Getting price for the products used from the supplier firms and convert these prices into the order for the presentation to the customer Ordering the furniture pieces online from Vibel factory in France by using 4D Vibel Shop program after agreement with the customer Coordination of relations with Vibel factory and head office in France Ordering the products used from supplier firms Following payment schedule of customers and preparation of invoice by using Tiger accounting program Organization of wallpaper application and sewing the fabric accessories such as curtain, bedspread Organization of montage of the furniture imported from Vibel Factory Coordination of after selling services