Giuseppe Sardo

Anlagen Manager SBB CFF FFS

Zollikofen, Berne, Switzerland

About

From 2023 SBB CFF FFS - ANLAGEN Manager Energienetze From 2018 LIEBHERR MACHINES S.A. - Aviation&Hydraulic Quality Department Manager From 2016 to 2018 LIEBHERR MACHINES S.A. - Common Rail System , Quality Engineer From Sept.2013 to 2016 - CNH Industrial - Injection system Product Development TL (Diesel & natural gas injection systems, fuel low pressure circuits, SCR DEF injection systems) From 2011 to 2013 - Fiat Industrial - Engine component validation and reliability - Quality system reference for ISO TS 16949:09 From 2001 to 2011 - Fiat Powertrain Tech. - Fuel injection system development responsible engineer (DRE) From 1997 to 2001 - Centro Ricerche Fiat : - Fuel injection system testing-lab specialist From 1996 to 1997 - Eurosystem Srl : - Numeric control manufacturing technician

Experience

  • Anlagen Manager at SBB CFF FFS
    Dec 2023 - Present · 2 yrs 7 mos

    Zuständig für das Life Cycle Management der Anlagen

  • Liebherr Group (7 yrs 10 mos)
    • Department Manager Quality
      May 2018 - Dec 2023 · 5 yrs 8 mos

      Project development and production site quality responsible for all the hydraulic products (Hyd. Axial Pump and Motors) designed, validated and industrialized at Libherr Machines Bulle.

    • Quality Engineer
      Mar 2016 - Dec 2023 · 7 yrs 10 mos

      Diesel Common Rail Systems. As member of the QM team i'm working with the CRS design team in order to develop a second generation high pressure pump and injector for internal combustion engines. Core competence in quality project management, problem solving tools and preventive FMEA analysis.

  • Injection systems development at CNH Industrial
    Sep 2013 - Feb 2016 · 2 yrs 6 mos

    Lead the injection component team (Diesel injection systems, natural gas injection systems, fuel low pressure circuits and DEF injection systems for the exhaust gas after treatment). Accountabilities : - manage interface with both supplier and customers during injection component development - define injection control strategies and performance for the light, medium and heavy duty applications - analyze customer requirements and define component/system specifications - develop efficient and effective component/system design - define and agree with supplier the component validation plan - specification of components installation guidelines - check the injection metering accuracy on engine/vehicle applications, gaining the customer agreement and sign-off. - support the engine project management in order to meet the scheduled start of production, tracking all the activities according ISO-TS16949 quality guideline - perform hazard analysis, FMEA and fault tree analysis - drive components methods and testing procedures definition - guarantee component/system continuous improvement (cost & quality) - perform benchmarking analysis - provide technical expertise during customer problem solving meetings

  • Quality and Reliability Engineer at FPT INDUSTRIAL
    Sep 2011 - Sep 2013 · 2 yrs 1 mo

    Product design, validation & reliability responsible. Accountabilities : - Drawing release process (product change management) - Quality system (ISO-TS 16949:2009) referent : - internal and external audit - provide training to Design Release Engineer - Methodological and technical support for failure mode and effect analysis (Design/System/Installation FMEA) - Management of procedure , instruction and norms - Management of the intranet web-site for documentation storage. - Provide methodological and technical support for component statement of requirements (SOR for out-sourced components).

  • Design Release Engineer at FPT Industrial
    Mar 2001 - Mar 2011 · 10 yrs 1 mo

    As Design Release Engineer for injection system components I was responsible for the following components : injectors for Diesel engines (direct combustion engines) , Rotary High pressure pumps (fuel feeding) , Rotative and distributor pumps and Injector-Pump . Main Activities : - Statement of Requirements definition for new product development. - Support to Purchasing (supplier sourcing). - Definition of component develop timing plan according to engine time to market. - RASI definition for each component develop process. - Management of validation and develop program. - Support to correct methodology (AIAG) appliance during the FMEA analysis for the engine components. - Support for the definition of component installation guideline. - Management of anomalies that occur in the network (technical support the to the quality department). - Support to quality improvement activities - Support to cost reduction activities - Project documentation update and storage according to ISO TS requirements