London, England, United Kingdom
Civil Engineering professional with over 10 years of progressive experience delivering high-profile UK infrastructure projects. Currently serving as Section Engineer on the Barhale Thames Water Framework (Mogden TWRM โ POS conversion), with a track record spanning HS2, Silvertown Tunnel (Riverlinx CJV), Thames Tideway, and multiple London residential and public realm schemes. I bring end-to-end site engineering expertise: RAMS & CPP preparation, Construction Phase Planning, Waste Management, DES reporting, permit administration (pump & break ground), two-week lookahead programme planning, and risk register management. Strong communicator โ comfortable leading daily briefings, Toolbox Talks, and presenting strategy to stakeholders. ๐ MSc International Project Management โ Anglia Ruskin University ๐ BEng Civil Engineering โ University of Naples Federico II ๐ชช CSCS SMSTS | Confined Spaces (Medium Risk)
Involvement in the conversion of the existing Mogden Thames Water Ring Main (TWRM) Inspection Shaft into a fully operational Pump Out Shaft (POS) โ a key resilience upgrade for the Hampton Country Zone. Key responsibilities: - Preliminary Strategy Presentations (PowerPoint) to project stakeholders, defining construction methodology and programme milestones - RAMS, CPP, Design Briefs, and ITP preparation for safe, compliant operations - Weekly Waste Management Plan updates ensuring full environmental compliance - Monthly DES Reports (Delivery Excellence System) tracking project KPIs - Daily briefings and Toolbox Talks to communicate safety and task objectives - Permit administration: pump operations and break-ground authorisations - Purchase orders for external plant hire and resource procurement - Site diary, allocation records, and photographic updates via SharePoint - Site inspections, plant checks, and muck-away delivery ticket management - Planning forecast activity and live risk register maintenance - Weekly project updates to management team and client stakeholders - Setting-out works, survey controls, and two-week lookahead programmes
HS2 - Shift Manager At Align Compound (South Portal), responsible for overseeing all daily shift site activities, ensuring work progresses in compliance with Inspection and Test Plans (ITP) and HS2 quality protocols. - Monitored and documented daily shift progress against programme targets - Processed and analysed as-built records from site engineers - Coordinated plant movements and site activities with the main contractor (Skanska-Costain-Strabag JV) - Maintained detailed site diaries, daily briefings, and site inspections
o Riverlinx CJV - Highway section of the Silvertown Tunnel project, responsible for the setting out of drainage and utility infrastructure up to the paving and landscape construction according to project specifications o Tideway - London's new super sewer project (Blackfriars - Chelsea site - Kirtling Street): setting out, checking plan, checklist inspection, drawing and quantities, checking concrete, prepare order of steel, VTS, rise RIF, held shift briefing
Worked with a specialist contractor in Groundworks and RC Frames, primarily involved in framework projects. Responsibilities included setting out, levelling, and surveying sites, reviewing plans and quantities, completing as-built surveys, managing materials orders, supervising site labor, and setting out precast elements.
Project Title: Elephant park, London Client: Lendlease Section: Public realm landscape, section MP1a Contributed to the ยฃ2.3 billion regeneration of 28 acres at Elephant & Castle, focusing on public realm civil works (MP1a section). Responsibilities included setting out and surveying drainage, walls, kerbs, roads, and landscaping, reviewing drawings and quantities, managing materials and documentation, conducting quality checks, and completing as-built surveys.