Taipei City, Taipei City, Taiwan
Working on the TTYMRT project Managing the ATC and RTS installation Managing the ATC Train Testing and RTS( RF_2.4 G Hz ) Test team leader Track circuit: validation tests, bonding plan checking SER: cable testing, functional testing, verification
T & C Engineer Team leader,Supervisor Signaling & Communication Supervisor ATC system and Wayside equipments Maintenance Supervisor Site manages the warranty for Nei_Hu Line.
Start to perform signaling system(ATC,EI) inspection, preventive and corrective maintenance work, trouble-shooting, emergent event recover, occasion search and System modification integration test official inspection and undertook WSS. To participate in original factory of Germany BWG-VAE-Siemens Turnout Maintenance Training, BWG Turnout Routine Inspection Training, BWG Turnout Maintenance with Switch Machine Advanced Training and actuality participate in BWG Turnout regulation.
Allocate the scope of work to the QC inspectors within Signal & Communication installation inspection、individual test、integration test official inspection and detect malfunction to supervise failures rectifying.