Gianluca Comin

TBM Construction Manager chez WeBuild

Sollières-Sardières, Auvergne-Rhône-Alpes, France

About

Un chantier titanesque commence avec le lot 2 de la nouvelle liaison ferroviaire Lyon-Turin. Ici 3 tunneliers s’enchaîneront dans les prochaines années afin de creuser environs 26 km de galeries de ligne. En parallèle, des autres partie d’ouvrages (galeries en ligne, rameaux et cavernes), du même ordre de grandeur kilométrique, seront achevées en traditionnel. PROUD TO BE HERE!!!!! « Chaque projet est un voyage. Comment ils s’écoulera tu l’apprendras seulement le jour du percement du tunnel….SCAVAAAAAAAAAA… » en mémoire de Ulisse Beozzo

Experience

  • TBM Construction Manager - TELT Chantiers Operationnels 6/7 Lyon-Turin at Webuild

  • Ingenieur Travaux TBM at Spie batignolles

    Chantier SMP4 - Nouvelle Liaison Ferroviaire Transalpine Turin-Lyon NFM Single Shield Hard Rock TBL 11,25 m

  • Warehouseman at United Colors of Benetton

    - Organization of the depot; - Merchandise checking; - Placement of no-shoplift on clothes.

  • Tunnel Division Specialist at Ghella S.p.A.

  • TBM Engineer at Toto Costruzioni Generali

    Assistente del direttore divisione scavo meccanizzato (Assistant of Mechanized Excavation Division Manager)

  • Jobsite Manager Assistant/TBM engineer (Sparvo Tunnel, TBM EPB Herrenknecht S-574 15,615 m) at Toto Costruzioni Generali

    - Daily analysis of DBF files, compiled by data acquisition program of the manufacturer Herrenknecht AG in order to monitor continuously TBM during excavation; - Relations with the supervision in terms of response and justification regarding both non-conformity reports and anomalies found during the advance; - Relations with Herrenknecht’s specialists on jobsite in order to communicate and then solve any problems or anomalies found in the EPB machine; - Daily control of the advance in the pilot cabin and of all repairs, maintenance (hydraulical, mechanical, electrical, etc.) and planned work (extent of ventilation, piping, cables of medium voltage, etc.) performed by the workers on the TBM ; - Supervision of maintenance / overhaul of the cutting wheel and of all operation regarding tools positioning (disks, rippers and scrapers); - Driving of the Herrenknecht EPB TBM S-574 "Martina";