George Glonti

Engineer

Geneva, Geneva, Switzerland

About

Experienced Engineer with a demonstrated history of working in the research industry. Career as a multi-cultural and multi-lingual engineer in physics, allowing me to develop strong project management and team management skills.

Experience

  • CERN (Full-time · 11 yrs)
    • Engineer
      Dec 2016 - Present · 9 yrs 8 mos

    • Engineer
      Aug 2015 - Dec 2016 · 1 yr 5 mos

      New Small Wheel (NSW) Upgrade Project at the ATLAS experiment. Implementation of the project, transmission to the knowledge, Study of materials and testing of equipment, logistics management.

  • CERN (Geneva Area, Switzerland)
    • Project Associate
      Jul 2009 - Jul 2013 · 4 yrs 1 mo

      ATLAS experiment CERN. R&D Project on Atlas Muon Upgrade with Micromegas detectors.

    • Engineer
      Aug 2005 - Jun 2009 · 3 yrs 11 mos

      Tile Calorimeter of ATLAS experiment, European Organization for Nuclear Research (CERN). Refurbishing, commissioning and certification of the Front End (FE) electronics of the hadronic calorimeter.

  • Engineer at Joint Institute for Nuclear Research
    Mar 2001 - Jul 2005 · 4 yrs 5 mos

    Department of the Colliding Beam Physics, Laboratory of Nuclear Problems of the Joint Institute for Nuclear Research. Monitored precision coordinate track detectors (MDT) creation and the muon chambers mass production organization for the ATLAS experiment muon systems.

  • Engineer at CERN
    Aug 2000 - Feb 2001 · 7 mos

    the NA-48 experiment on SPS , CERN. Manager of the group of the JINR experts, participating in the reconstruction of the high precision drift chambers of the NA-48 installation.

  • Joint Institute for Nuclear Research (Dubna, Moscow region, Russia)
    • Engineer
      Jan 2000 - Jul 2000 · 7 mos

      Department of the Colliding Beam Physics, Laboratory of Nuclear Problems of the JINR. R&D for Muon spectrometer Monitored Drift Detectors. Construction of clean room, preparation of drift tubes production with automatic assembling lines. Drift tubes production, testing and certification.

    • Engineer
      Jan 1996 - Dec 1999 · 4 yrs

      Laboratory of Particles Physics of the Joint Institute for Nuclear Research (JINR). Development, creation and organization of honeycomb structure drift detector mass production for Outer Tracker of the HERA-B experiment (DESY Germany).