Dubai, United Arab Emirates
Faisal Karim is a associate member of Pakistan Engineering Council. He has more than 12 years of post-qualification experience with great dedication towards his profession and obtained distinguished knowledge of Power Generation, Distribution & Power Synchronization. Installation of TX, GIS, AC & DC DB’s, Rectifiers, Generators and Cable Tray/Ladder. Currently working with Hitachi Rail as “Rail System Installation Engineer” on Etihad Rail DB Project.
• Report to the Construction Manager to ensure the execution of the construction-related portion(s) of the Project within time and budgetary constraints, and in compliance with Health & Safety, Quality, and Environmental Plans, and regulatory requirements applicable to the Project • With the support of Field Inspectors ensure the implementation of the HS&E rules as required by the HSE Management Plan. • Ensure the Subcontractor submits all necessary Work Methods, Site Specific Work Plans and Activity Hazard Analyses for tasks including any registration or licensing requirements for Special Processes. Record these documents in Team Center, and ensure they are approved and implemented for all site work. • Maintain a record of subcontractor installation progress and provide weekly reporting to the Construction Manager of subcontractor progress vs the baseline construction schedule to support the processing of subcontractor invoicing. • Identify potential problem areas and risks, then support the development and implementation of mitigation actions • Interface with all key stakeholders including client, internal functions and subcontractors to ensure a coherent and achievable 2 week look-ahead work plan and a 4 week look ahead forecast. Monitor this plan and ensure timely communication of issues and actions as they arise. • Monitor the construction schedule and provide up to date forecasts of progress and changes to the Project Scheduler • Provide the interface with Installation Engineering to ensure the availability of approved, constructible designs within required time frames. • Track responses to Non Conformance (NCRs) and Requests for Information (RFI) to ensure timely resolution. • Monitor the site materials inventory, report on material availability and shortages for work planned and ensure correct management of the site materials
Management & Supervision of Viaduct, Stations and Tunnel Activities. Handling subcontractor as main contactor in context of ensuring daily progress. Installation of Cable Ladder, Trays and Truncking of MV, LV, Control & Fiber Optic. Supervision of lifting and skedding for all types of equipment with EHS rules & regulations. Installation of 33KV Switchgear, LV & Control Panels, Traction Protection & Distribution Cubicles, Hesope System and Transformers. Cable Laying and Cable Terminationsmof LV, Traction, Control and Power Cables. Grounding (Mech, Clean Earthing & Power Earthing). Megger Test for cables, DC Equipment and High Pot for MV Cables. Third Rail Cables Terminations. Ensured all activities as per Approved Drawings & Quality Standards. Followed Safety for Person & Equipment while assignments. Assignments completion with approach of scheduled project timeline. Office & Site Coordination between other system contractors. Managing Activities in Existing Metro Stations as LPIC under SERCO Operations.
Perform site-specific engineering analysis. Evaluation of energy efficiency for solar projects involving residential commercial, or industrial customers. Provide technical direction or support to installation team. Solar system commissioning and performance monitoring. To suggest and implement modifications for the improvement of plant, Substation. Worked on PLC systems, synchronization, and load sharing system. Responsible for installation/operational level understanding of Grid, Off Grid and Hybrid PV systems. Installation of net metering system. Worked on multiple projects like Roof or Ground mounted Installation.
Prepare shop drawings for LV, MV, Lighting, Power, AC Power, Panel Schedule and SLD technically. Well handling the operation and maintenance for 400 KVA CATTERPILLER GENERATOR MODEL: 3406, 147 KVA OLYMPIAN GENERATOR MODEL: GEP 150 and 110 KVA OLYMPIAN GENERATOR MODEL: GE 110 ENGINE MODEL: 3056. Estimates, prepares and assigns the resources such as manpower, materials consumables, equipment, tools, etc., required for all electrical and related works prior to execution. Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required. Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications and all applicable standards whether local, national or international standards. Worked on 380 KV Substation, Erection of Transformer, 380 KV and 132 KV GIS switchgear. Installation of Grounding, lightning and protection systems.