Fabian Schell

AUSZEIT bis auf weiteres

Stuttgart Region

About

With more than 25 years of professional experience (15 years out of that working for independent Consulting companies) and holding various industry positions like Project Manager, Product Manager, Head of System Engineering during that time, I have gained valuable expertise from numerous high voltage underground cable projects, both in HVDC and EHV AC. Main areas of expertise: Large transmission projects, especially involving underground cables (HVDC and EHV AC, also offshore and submarine)

Experience

  • Fichtner (12 yrs 6 mos)
    • Senior Project Manager at T&D Department
      Jan 2021 - Dec 2024 · 4 yrs

    • Power Cable Expert - T&D Department
      Jul 2012 - Dec 2024 · 12 yrs 6 mos

      Planning, Permitting and System Engineering of - AC Underground Cable Systems up to 500kV - HVDC Submarine and Land Cable Systems - Power cable rating calculations - Power cable expert issues (various) - Internationally financed (IFI) projects; ADB, WB, KfW, ...

    • Deputy Chief Engineer and EHV Power Cable Expert for the 380 kV grid connection of Niehl 3 CCPP
      Sep 2013 - May 2015 · 1 yr 9 mos

      Project features: - 380 kV underground cable connection (UGC) of approx. 9 km: 1 circuit, laid in trefoil in ducts 9 sections, 24 joints, 27 cable drums of up to 1200 m Complicated route through port/industrial/city area with numerous crossings and HDD sections - 380 kV overhead line (OHL) of approx. 6 km length with Rhine river crossing - 380 kV GIS and 380/110 kV phase-shifting transformer at power plant terminal Activities: - Quality control of the production of cables and accessories, routine and sample tests (“system sample test” acc. to DIN VDE 0276-2067), FAT - Witnessing the Extended Prequalification (ePQ) test acc. to DIN VDE 0276-2067 (German version of IEC 62067) - System engineering and all design review related to the 380 kV UGC (earthing, laying, joint bays, terminals, …) - Failure analysis, investigations, improvement of jointing procedures - Interface planning and management at transition points GIS/cable and cable/OHL (civil, electrical, FOC, I&C) This project will be one of the longest 380kV underground cable connections in Germany.

  • Technical Tender Coordinator for the SuedLink HVDC cable project at large German TSO
    Mar 2017 - Dec 2020 · 3 yrs 10 mos

    SuedLink HVDC Project: - Transmission capacity of 2 GW (per corridor); 2 corridors - 700 km underground/land cable connection across Germany - Continuation of 1400 MW NordLink project (Norway-Germany subsea cable) - Commissioning envisaged for 2025🤪 https://www.netzausbau.de/leitungsvorhaben/bbplg/03/de.html Main activities: - Preparation of full set of Tender Documents for „HVDC Cable Package”, including - All Technical Specifications, project specific and interface documents - Management of electrical interface between HVDC Cable and Converter - Technical support for the preparation of contract documents (legal workstream) - Active involvement in negotiations with bidders / cable suppliers until contract award

  • Senior Engineer, T&D Specialist at Pöyry Energy
    Apr 2008 - Jun 2012 · 4 yrs 3 mos

    Business Area Transmission & Distribution Business Area Hydropower Consulting, Engineering

  • Head of HV Cable System Engineering, Product Manager at Brugg Cables
    Jul 2004 - Mar 2008 · 3 yrs 9 mos

    - Complete underground cable system engineering up to 500kV - Special internal development projects, Knowhow transfer agreements (Iran, Mexico) - Sales support, Tender preparation (technical) - Training of sales and project staff - Providing cable consultancy services to cutsomers in Mexico - Representative in national and international gremia (Europacable, IEC/CENELEC, Cigre)

  • Project Manager EHV Cable Systems at Südkabel / ABB Energiekabel
    Jul 2001 - Jun 2004 · 3 yrs

    400kV Cable Tunnel Project (15km) Madrid-Barajas, Spain 400kV Cable Project Hradec (first EHV XLPE in Czech Republic) 400kV Cable Project Tala Hydropower Plant, Bhutan et al.