Eric Wade Jansen Van Rensburg

Consulatant

Molina de Segura, Región de Murcia, Spain

About

I am a highly motivated individual who enjoys the development and management of new projects. I have enjoyed a varied career path which has touched on many disciplines. I have worked in various fields that have included farming, diving, installations of various types of equipment both mechanical and electrical, management of projects and people.

Experience

  • Contractor Representative at GE Vernova
    Sep 2021 - Present · 4 yrs 10 mos

    Project Management, Contractor Representative and Site Manager

  • General manager / Director at RENSLAN investments LTD
    Jan 2013 - Present · 13 yrs 6 mos

    Project development for commercial fishing, transport and small scale farming.

  • Senior Consultant at Frontier Energy | Africa
    Sep 2017 - Feb 2025 · 7 yrs 6 mos

    Renewable Energy Construction management, Commissioning & project reviews after COD.

  • Mavuzi / Chicamba Project Site Coordination Manager at CEGELEC SAS
    Apr 2015 - Jan 2017 · 1 yr 10 mos

  • Project Manager at Gas Natural Fenosa
    Apr 2014 - Mar 2015 · 1 yr

    Project Manager for Bujagali Power Station Radial Gate 1 downstream repair program. Reports to: · VP Operations O&M Energy, S. A. Gas Natural Fenosa · Bujagali Power Station Manager. Required to interface with the following: · Maintenance Manager. · Commissioning Engineers. · Logistics company. · Erection Supervisors. · Project Consultants. · Civil Department / Subcontractors. · Electrical Department / Subcontractors. · Customer or his representative · HSE Department. Role I was responsible for the management of the recovery program for the equipment of the Radial Gate 1 Downstream Repair Program. I was responsible for the project planning and for the arrangement of the contracts with the various contractors required at the site and the handling of the day to day works of the contract. I was responsible for the removal from site of all of the damaged equipment that required repair. This was sent to the repair facilities in Kenya where I was responsible for the inspections with the consulting engineers and the main client. This included the FAT’s required for the release of the equipment and the reinstallation and testing of the equipment