Eric Lee

Technical Manager

Taiwan

About

• Technical/Project Leader at Emerson/Foxconn 1. Identify feature/scope and perform requirement analysis for customer 2. Architecture design and work breakdown with the tem to develop schedule / quality / performance 3. Leading, mentoring team member to achieve the project goals • The Experience on Embedded System (1999/10~) 1. OpenFlow Switch (Hardware Base) 2. IBM Server/Multi-blade system (Integrated Management Module 2) * Onsite support with IBM CSTL at China Shanghai about 2 months 3. Cisco Multi-blade System: ATCA Media Server * Cisco NSG employee qualification and co-work with Cisco at USA San Jose in 3.5 months * IPMC/MMC bring up and implement Diag System for HW/EDVT/MFG 4. Cisco IP Phone 5. VoIP 1/2 port TA 6. VoIP-A card on AG5000F * IOT in Japan Yahoo SBB in 8 months. 7. ADSL concentrator 8. Gigabit Ethernet Switch, IAD 9. ADSL Router, Gigabit Ethernet Switch, IAD 10. English / Chinese translator, PDA and Palmtop • Network Management System (1999/10~2002/8 at Foxconn, BenQ) a. Cisco Wi-Fi Phone b. E1 Multiplexer, IDSL Concentrator • System Test (1998/7~1999/10 at Siemens)

Experience

  • 技術經理 at 必維集團
    Mar 2022 - Jul 2022 · 5 mos

    1. ISA/IEC 62443-4-1 Assessment (Gap analysis, Evidence Analysis) 2. ISA/IEC 62443-4-2 Assessment (Gap analysis, Evidence Analysis) 3. Develop ISASecure Host Device CSA Test Plan 4. Build up cybersecurity LAB: Fuzzing tool evaluation, Test management evaluation

  • Assistant Project Manager at MOXA
    Sep 2018 - Mar 2022 · 3 yrs 7 mos

    1. Product Security Center (PSC) a. Review/modify SDLC documents by IEC62443-4-1 for Moxa network/embedded devices and pre-assessment by ISAsecure CBTL Exida. b. Created PSIRT development plan and approved by Moxa cybersecurity committee. 2. Rail Projects - SW PM a. IEC62443-3-2, IEC62443-4-2 a1. Performed risk assessment (IEC62443-3-2) for Rail project. For example: Clarified/defined Rail security context, initial/detail risk assessment. a2. Developed security requirement by IEC62443-4-2 and result of risk assessment for industrial AP AWK-3252A/4252A. a3. Improved or migrated the legacy software design to meet IEC62443-4-2. For example: backdoor mechanism, login authentication/privilege method. b. Schedule/Resource/Change/Risk management on Rail projects. c. Identify/clarify SW features from customer requirement. 3. 4G TAU (Train Access Unit) – Lead 3 RDs a. Identify feature/scope with customer and requirement analysis in software development. b. Work breakdown and status tracking with team members. c. Modify and design connection manager to meet eM120/LTE-M behavior and implement the debug mechanism. d. Guide team member for platform bring-up and diagnostic test with HW team. e. Field try in China TCT and Beijing Jiaotong University LAB. 4. Wireless TSN – Build up Software QA team a. Developed SW QA operational model, execution plan by basic maturity level through Debug mechanism in SW requirement/design, SQA planning, SQA execution and SQA reporting. b. Setup bug tracking workflow and Xray test management between SW QA and SW RD. c. Created SOW for vendor.

  • Technical Associate Manager at Foxconn
    Dec 2012 - Apr 2018 · 5 yrs 5 mos

    1. Smart/Managed Stackable Switch Development a. Identify feature/scope and requirement analysis. b. Architecture design and work breakdown with the team to develop schedule / quality and performance. c. Porting LACP from Linux kernel in Broadcom UM for DGS-1100 smart switch. d. Platform bring-up and customize the L2/L3 features in Broadcom Fastpath for DXS- 1100, DGS-3130 stackable switch by BCM Hurricane3. e. Bring up stacking switch and co-work with customer as consultant. 2. OpenFlow Switch Development a. Project Management and SDN research. b. Porting Open vSwitch(OVS) to Switch (hardware based). Implement the middleware to support OpenFlow 1.0 on switch d. Porting BRCM OFDPA. 3. Co-work with Brocade for platform/application bring-up at San Jose (2 months)

  • Senior Software Engineer (Technical Leader) at Emerson Network Power
    Sep 2010 - May 2012 · 1 yr 9 mos

    1. Identify feature/scope and perform requirement analysis for customer IBM 2. Architecture design and work breakdown with the team to develop schedule / quality / performance 3. Leading, mentoring team member to achieve the project goals 4. IPMI / Security Manager / PAM / CEMGR / SMASH (sfcc, sfcb) / Service Advisor implementation and maintenance on IBM server and multi-blade system 5. Onsite support with IBM CSTL at China Shanghai about 2 months

  • Deputy Section Manager at Foxconn
    Aug 2001 - Jul 2010 · 9 yrs

    1. Project Management a. Team Building (IP Phone, Diag) at China ShenZhen b. Lead 12 team members for Cisco IP Phone Development (SIP/SCCP, MMI, Web server, Provision server development) c. Lead 5 team members for Diag on ATCA/24 Port Switch project System bring up (u-boot, kernel, USB, PCI, Flash, Memory…) and Diagnostic System Development 2. Software contact window to Cisco (weekly status/bug tracking) 3. ATCA a. Cisco Chassis Based Media Server b. Embedded Linux c. IPMC/MMC bring up & System Management d. Cisco NSG employee qualification (2008~) Co-work with Cisco at USA SJ in 3.5month. 4. VoIP 1/2 port TA Implement the call features (call waiting, forwarding and three-way conference) with SIP protocol in VxWorks platform. 5. VoIP-A card on AG5000F IOT in Japan Yahoo SBB in 8 months. 6. ADSL concentrator Develop web server and CGI in Virata platform. Design Web page by JavaScript in DreamWeaver. 7. Gigabit Ethernet Switch, IAD Develop SNMP