Williston, Vermont, United States
Experienced Senior Vice President with 30+ years of demonstrated history of working in the civil engineering industry. Skilled in Geotechnical Engineering, Civil Engineering, Structural Engineering, Subgrade Inspection, Contract Management, Project Management and Value Engineering. Strong professional with a Bachelor of Science (BS) focused in Civil Engineering from University of Vermont.
Senior Vice President in charge of civil and geotechnical engineering since December 2000, managing all geotechnical investigations and many of the civil engineering projects. Representative slope studies include the proposed Williston portion of the Circumferential Highway and the VELCO New Haven Substation upgrade. Representative slope repair designs include 196 Brosseau Road (Highgate, VT), River Road (Cambridge, VT), 216 Button Bay Lane (Ferrisburgh, VT), 1377 Braeloch Road (Colchester, VT), Lower Pleasant Valley Road (Cambridge, VT), 28 Starr Farm Beach Road (Burlington, VT), States Prison Hollow Road (Starksboro, VT), Ryegate Substation access road, Main Road (Huntington, VT), Burlington Bike Path and Route 127 off-ramp failures, stabilization of the Depot Street embankment (Waterfront Housing Project) in Burlington, and stabilization of a 1000 to 2000 CY clay embankment failure at 60 College Street (Montpelier, VT). Foundation reports include the Spruce Peak Adventure Center in Stowe, Burlington Waterfront Housing Project, over 100 miles of VELCO transmission line upgrades plus approximately 18 new or upgraded substations around Vermont, River Station Housing Projects (Phases 1 & 2) in Montpelier, the Green Mountain Plaza Shopping Center expansion in Rutland, and the BIA North Terminal Expansions 1 & 2. Construction monitoring reports include establishing a Construction Monitoring Program for the Williston portion of the Circumferential Highway embankment construction in order to set parameters for geophysical equipment placement and usage of the data from this equipment.