Eric Cruz CESCII CPM

Data Centers (Core & Shell, MEP & TI) | BESS | Power Generation | LNG | Pipelines | Compressor & Meter Stations | Water/Wastewater | E&I | Project Controls | Planning & Scheduling | Estimating | PMO Leadership

Round Top, Texas, United States

About

Dynamic and results-driven project management professional with extensive experience leading major Oil & Gas infrastructure projects—including LNG facilities, cryogenic systems, power plants, pipelines, compressor and meter stations, and slug catchers. Proven expertise in Electrical & Instrumentation (E&I) project management, estimating, planning/scheduling, and project controls. Skilled in Primavera P6, cost control, earned value management, and cross-functional team leadership across all project phases—from FEED to commissioning. Adept at managing high-stakes environments with a commitment to safety, precision, and performance. Whether leading as a Senior PMO Specialist, Project Controls Manager, or Estimator, I bring technical depth, strategic vision, and hands-on field experience that deliver real value to capital projects. 🔹 Available for new opportunities in Oil & Gas, LNG, Energy, and Infrastructure projects. 🔹 Let’s connect and explore how I can contribute to your team’s success. Project Management Experience 21 years Estimating 21 years Project Scheduling 21 years Environmental Compliance 21 years Construction Inspection 21 Years Microsoft Project 1998 2010 2013 - 21 years Sure Track, 21 Years Primavera P3 P5 P6 - 21 years Conventional Civil Survey 23 Years Terra-model 3D Modeling Autodesk Auto CAD Civil 3D 21 Trimble GPS Data Collection 23 Years SAP 10 years Oracle 20 years Coupa 5 years CloudEPC 3 years

Experience

  • Senior Project Scheduler at The Haskell Company
    Dec 2025 - Present · 7 mos

    As Senior Project Scheduler for large-scale mission critical and infrastructure projects including STACK Project SHV200, FluidStack data center campus, Aspen WTF, and Carrizo Springs WTP, I lead the development, integration, and governance of multi-phase, multi-building master schedules supporting fast-track EPC delivery. My role bridges project controls, field execution, and client alignment, ensuring schedule integrity, predictability, and transparency across all disciplines. I develop and maintain fully logic-driven Primavera P6 schedules from Level 1 through Level 4, integrating civil, structural, architectural, MEP, commissioning, and turnover scopes. I work closely with construction leadership, trade partners, and client stakeholders to validate sequencing, staffing plans, constraints, and milestones while proactively identifying schedule risk and recovery opportunities. In this role, I serve as a trusted scheduling authority across mission critical data centers and water/wastewater infrastructure, supporting executive decision-making, change management, and client reporting for some of the most schedule-sensitive project types in the industry.

  • Sr. Project Scheduler at Gallant Industrial
    Oct 2025 - Jan 2026 · 4 mos

    Senior Scheduler at Gallant Industrial supporting industrial EPC projects through advanced Primavera P6 scheduling, progress measurement, forecasting, and Project Controls–level analysis. Trusted advisor to project and construction leadership on execution strategy and schedule risk.

  • Project Controls Manager / PMO Specialist EPC Golden Pass LNG & Northwind Titan Treater Projects at Saulsbury
    Oct 2022 - Oct 2025 · 3 yrs 1 mo

    • Managed and coordinated all Project Controls activities for EPC Golden Pass LNG & Northwind Titan Treater | Pecos Cardinal Midstream Cryo projects | Cardinal Cryo Gas Treating Project | PEAK Pecos Power Plant | BESS • Led development of project-specific PC execution strategies and coordinated with SPM and PM on reporting and project controls activities: Cost Engineering, Risk Management, Change Management, Planning / Scheduling

  • Chief Inspector Environmental / Construction Compliance Program at Tetra Tech, Inc. Assigned to Energy Tranfer / Sunoco ME 2&2X project Spreads 1,2, 3, 4 & 5
    Jul 2017 - Oct 2022 · 5 yrs 4 mos

    • Ensuring appropriate staffing level of Environmental Inspectors; • Overseeing the environmental inspection program across the project and/or spreads; • Establishing and maintaining effective communication channels with the Construction Management Team and Contractor; • Serving as the primary liaison to the Pipeline Company Construction Management Team, as well as with any third-party Compliance Manager; • Overseeing the preparation, maintenance, and implementation of all Project environmental reports, tracking tables, databases, and/or, training programs; • Overseeing the implementation of all agency-mandated environmental conditions and mitigation measures; • Overseeing identification and resolution of all non-compliance issues including documentation and corrective action; • Ordering corrective actions to address violations of the environmental conditions of the PADEP project wide permits and USCOE EA Certificate • Overseeing resolution of all complaints in regards to environmental problems/concerns or mitigation during both construction and restoration • Overseeing development of weekly reports for submittal to PADEP and local County Conservation Districts summarizing the results of the reporting period’s inspection • Overseeing the coordination and processing of all variance requests from contractors, including maintenance of a Variance Tracking System (if applicable); • Maintaining a library of all field reports including Environmental Inspector daily reports, in-field training records of construction personnel, variance requests, spill reports; and • Evaluation of the construction contractor’s implementation of the environmental mitigation measures, as specified in the contract and other authorizing documents

  • Lead Environmental Construction & Permit Complaince at Tetra Tech, Inc. Assigned to Sunco Mariner East II Project
    Feb 2017 - Jul 2017 · 6 mos

    • Manage Environmental Inspectors daily assignments • Review and Edit environmental inspectors daily reports • Attend weekly progress meetings with the contractor • Attend preconstruction meetings with the client • Assist Inspectors during new installation of gas gathering lines according to project specific plans • Oversee conditions of environmental regulatory authorizations, and the mitigation measures proposed by Sunoco Logistics • Documented and oversee corrective actions, if necessary, to ensure compliance of the construction contractor performing new gas gathering line construction • Monitor the contractor during new installation of gas gathering lines projects • Document all events regarding the Spill Prevention, Containment, and Control Plan (SPCC • Documented and oversee corrective actions, if necessary, to ensure compliance • Assist Lead Environmental Inspectors in the field as a floating Environmental Inspector • Overseeing contractor implementation of environmental conditions and mitigation measures as set forth in Client Plans and Procedures, the FERV Certificate, and all other permits, clearances, or other authorizing documents • Coordinating with any third-party Compliance Monitors • Overseeing installation, maintenance, and removal of erosion and sediment control measures, including photo documentation • Overseeing crossings of flowing waterbodies, including any deviation from plans and photo documentation before, during, and after construction and restoration • Overseeing right-of-way restoration including reseeding