Experienced Project Manager with a demonstrated history of working in the oil & energy industry. Skilled in Petroleum, Gas, Structural Engineering, Metal Fabrication, and Construction. Strong program and project management professional graduated from Università degli Studi di Pavia.
Project Director / Contractor Representative of COMP 2 Project. The Scope of Work includes Engineering, Procurement, Construction, Installation, Hook-up and Commissioning of two compression platforms (topsides 30 000 metric tons each, jackets 10 000 metric tons each), two accommodation platforms (topsides 5 000 metric tons each, jackets 3 000 metric tons each), two flare systems, brown field. CLIENT: QatarEnergy LNG
Fixed Facilities of BERRI DEVELOPMENT Project. Responsible for the execution of the project for all the aspects (technical, procurement, fabrication operational and for economic results). The Scope of Work includes Engineering, Procurement, Construction, Installation, Hook-up and Pre-Commissioning of 11 offshore oil wellheads topside (800 Metric Tons each), Tie-in platform topside (3200 Metric Tons), Tie in platform jacket (2300 Metric Tons). A Brown Field portion is also part of the Scope of Work. Reporting to Saipem Execution Manager of the Middle East Area. Client: Saudi Aramco.
Project Manager of Karan offshore 52 / 60 Complex Project and Arbi 20 / 23 offshore Project. Karan 52 / 60 Complex Project scope of work includes one gas wellhead topside (1200 Tons), one gas wellhead auxiliary topside (1450 Tons), one Tie In gas platform topside (2350 Tons), flare and bridges systems (1100 Tons), observation platform (600 Tons), auxiliary wellhead jacket (1000 Tons), Tie in platform jacket (1000 Tons), 1 Km of 15 Kv submarine composite cable, 1.5 Km of internal cladded sealine 20” dia. Arbi 20 / 23 project scope of work includes one gas wellhead topside (1500 Tons), 5.3 Km internal cladded sealine 12” dia, 5 Km of umbilical, brownfield works on existing Arbi TP platform. Client Saudi Aramco
Responsible for integration construction works of Jangkrik FPU (Floating Production Unit), consisting of a topside of 14500 Tons to be integrated with living quarter, hull, flare, sea water system, fire water system, electrical network, instrumentation devices, etc.
Responsible for the Middle East area of the activities related to offshore fabrication, offshore hook up and brownfield business
Responsible of a team of more than 100 engineers specialized in the following technical disciplines: - offshore structures and civil structures; - preparation, planning and execution coordination of offshore hook-up works; - naval design; - technical assistance to Procurement department for material purchasing.