Edwin Jefry Adolf Hasibuan

Offshore Methods Engineer at Saipem S.p.A Abu Dhabi

Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates

About

Senior Field Engineer/Offshore Methods Engineer with 7+ years experience in pipeline, risers and umbilicals and jacket installation

Experience

  • Offshore Methods Engineer at Saipem
    Oct 2025 - Present · 9 mos

  • McDermott International, Ltd (Full-time · 6 yrs 10 mos)
    • Senior Field Engineer
      Oct 2024 - Oct 2025 · 1 yr 1 mo

      8-legged CPP Jacket installation for Block B Project (Phu Quoc Petroleum Operating Company) - Vietnam - Weight of jacket 7700MT and water depth 76.5m - Use of Intermac 650 for jacket launch (the 2nd largest float-over installation barge in the world) - Installation and upending of jacket with DLV2000 vessel - pile installations with each weight 215MT and length 64m - technical reviews of all project items i.e. hammers, ILT, grouting system, lifting riggings, etc. - design of various installation aids and also flooding spread for upending jacket i.e. hydraulic lines, valves, pumps, etc.

    • Field Engineer
      Apr 2021 - Oct 2024 · 3 yrs 7 mos

      • Installation of 20-off Suction Piles Offshore Western Australia for Scarborough Project. - Diameter, Height & Weight : 8m, 23m, 358MT - Water Depth : ~950m - Penetration Depth : 21.5m • Onshore Double Jointing for Inpex Ichthys P2A Project. - set up DJ facility and fabricate below - 1457 ea 16in DJ CRA Pipe - 750 ea 8in CS Pipe • Reel Lay with LVNO105 for ONGC KG-DWN/98-2 Project Season 3. Installing below: - 14x PLET’s - 2x ILT's - 20.8km of 15/10" Pipe-in-Pipe installed depth from 400m to 525m. • Umbilical Transpooling with NO102 at Nexans Facility, Norway with NO102 for BP Tortue Projects. • Umbilical Installation with NO102 in Mauritania for BP Tortue Project. Depth ranges from ~100m to ~2700m. • Risers Transpooling with NO102 at Kakinada, India for ONGC KG-DWN/98-2 Project Season 4. • Risers Installation with NO102 in India for ONGC KG-DWN/98-2 Project Season 4. - 6x 10” Oil Production Risers with depth varies around ~400m.

    • Associate Field Engineer
      Jan 2019 - Apr 2021 · 2 yrs 4 mos

      • Spool Base scope for ONGC KG-DWN/98-2 Project Season 1 - set up spool base facility and fabricate below - 14”, 10” & 8” pipestalks with 100+ kilometers of pipeline • Reel Lay with LVNO105 for ONGC KG-DWN/98-2 Project Season 1. Installing below: - ~28km of 14in Gas Production Pipeline - ~9km of 10in Gas Export Pipeline - 1x ILT for 14in Gas Production Pipeline

  • Engineer Internship at PT. Pelabuhan Indonesia II (Persero)
    May 2017 - Jun 2017 · 2 mos

    designing and rejuvinating dock structures using bore piles with help of SAP2000 (Structural Software for Analysis and Design)