Rio de Janeiro, Brazil
Fifteen years of experience in maintenance planning, offshore projects, KPIs management, research of composite materials and Artificial Lift operations.
➢ Coordinates the preparation (planning/execution of inspections and tests at AMO) of ESP strings to be installed (Pumps, Seals, Motors, Gauges, Clamps) ➢ Responsible for monitoring the segregation of miscellaneous, tools and consumables to be sent for the offshore workovers. ➢ Coordinates the preparation of torqued subassemblies at base. ➢ Embark as a team leader interfacing with customer to ensure a safe and quality ESP workover during pulling/installation. ➢ Coordinates sensors tests along with CWI team. ➢ Teardown monitoring of pulled equipment for RCFA. ➢ Creation of procedures for inspection, pulling and installation, HAZIDs, pre-job and After Action Review reports. ➢ Issuance of purchase orders for miscellaneous, tools and consumables required for well intervention campaigns.
➢ Responsible for planning the annual Clinker Kiln Shutdown – Critical path schedules, cost management and third party control. ➢ Planning CAPEX activities with the Project team. ➢ Optimization of resources (labor and materials) – Balancing maintenance plans (SAP). ➢ Monitoring mechanical maintenance activities (corrective, preventive and predictive) on large equipment (rotary kiln, crushers, ball and vertical mills, conveyor belts).
➢ Implementation of Reliability Engineering in the Plant – use of failure analysis, pareto, FMEA and RCM. ➢ Improvement Projects – Industry 4.0 – implementation of vibration and temperature monitoring sensors in the Plant’s main engines and gas analysis sensors in oil transformers. ➢ Management of critical controls related to liquid fuels at the Plant (Diesel and Acid Sludge). ➢ Qualification of new suppliers. ➢ Standardization of process, equipment and tools.
➢ Responsible for boarding planning of integrated activities on one vessel (MV18) from fleet by centralizing maintenance , integrity, painting, calibration, processes, and others demands. ➢ Responsible for the construction of the annual budget with support areas – operation, maintenance, integrity, processes. ➢ Shutdown planning with the project team and other support areas. ➢ Responsible for aligning demands from the customer (Petrobras), regulatory entities (ANP, ABS, Navy, IBP) and from on-board inspectors with the available POB. ➢ Commissioning of software for planning, scheduling, shipment management and work schedules (Drake).
➢ Responsible for calculating all operations' KPIs from the fleet by processing and analyzing databases (Alteryx) – Production, HSE, Maintenance, Integrity, Penalties, and other indicators. ➢ Responsible for creating new KPIs in alignment with company's strategy and cascading of annual goals. ➢ Creation of Process Workflows from other areas (Microsoft Visio), such as Maintenance and Integrity. ➢ Commissioning of the new maintenance management software (SAP) to ensure proper migration from the old one.
➢ Pipeline design in improvement projects of FPSOs, rigs and oil refineries using "clouds points" (Navisworks) integrated to the CAD software (Microstation). ➢ Stress, clash and explosion studies on designed pipe supports. ➢ Issuance of isometrics and floor plans using ergonomics tables, pilot valve station standards, line spacing handbooks and typical supports. ➢ Issuance of “As Built” reports with the scope of the requested services – reading and interpretation of isometrics, equipment drawings, P&ID, manuals, descriptive memorials, and calculation memories.
Coordinated a team of 20 agents to sell tickets for the Rio 2016 Olympic games at a box office Served 4000 plus customers daily Took on a backoffice function to support all Olympic games box offices across the country. Participated in customer service and cooperated with the finance team in resolving problems such as refunds