Calgary, Alberta, Canada
As a Civil Engineering graduate with diverse experience across field inspection, quality assurance, and infrastructure project coordination, I bring a strong foundation in both technical and practical aspects of construction and site development. My work on high-impact projects—ranging from municipal water systems and metro rail development to commercial property maintenance—has sharpened my ability to manage on-site challenges, ensure compliance with standards, and maintain smooth communication between teams, clients, and contractors. I have hands-on experience in material testing, compaction control, concrete inspection (ASTM/CSA standards), and report generation, supported by strong organizational skills and a safety-first mindset. Whether it's in the lab or on-site, I take pride in delivering reliable, detail-oriented work that contributes to the success of each project.
• Conducted fieldwork including groundwater monitoring, soils sampling, and data collection through test pit excavations and borehole drilling, ensuring accurate and reliable results. • Oversaw subcontractors during ground disturbance activities, utility location, borehole drilling, groundwater monitoring well installation, and test pit excavation to ensure compliance with safety standards and project specifications. • Directed remedial contractors during excavations, managed waste tracking, and provided progress reports to ensure efficient and compliant site remediation. • Prepared and coordinated all necessary documentation for field programs, including managing field notes, data entry, and assisting with report preparation to maintain accurate project records. • Performed work tasks efficiently while adhering to industry standards and regulatory requirements, ensuring project compliance and quality control. • Proactively identified and reported potential and existing site hazards, near-miss incidents, and loss incidents, contributing to a safer work environment. • Developed and strictly adhered to site-specific health and safety plans to mitigate risks for clients, employees, and the public, ensuring compliance with EXP’s Life-Saving Rules.
• Worked with a core team of 6 employees and additional temporary laborers to support the growth and development of a newly established company. • Efficiently scheduled and managed work assignments for teams involved in property maintenance, snow removal and pressure washing of the driveways, ensuring optimal allocation of the resources and timely completion of the projects, contributing to the company’s revenue of 1.3 Million CAD in 2022-23 • Acted as the primary point of contact for over 8 clients, gathering requirements, addressing concerns, and ensuring customer satisfaction through regular communication. • Sourced and coordinated temporary and seasonal workers, hiring over 30 temporary workers to meet the fluctuating demands of the business, ensuring the right personnel were assigned to appropriate tasks. • Maintained detailed records of all scheduling activities, client interactions, and job progress to ensure seamless operations and accurate reporting.
• Supervised the filling of excavated earth into trenches and foundations, consolidating layers through plate and roller compaction and watering to ensure proper compaction and stability for water infrastructure. • Managed the mechanical transport of essential materials such as lime and moorum, overseeing loading, unloading, and stacking to support construction activities. • Coordinated the provision and installation of mild steel pipes with cement mortar lining and coal tar coating. Ensured compliance with IS codes (IS 3589:2001 and IS 10221:2008) for optimal water flow and corrosion resistance. • Supervised the laying and jointing of glazed stoneware pipes (class SP-1) with cement mortar, including testing for leak-proof joints to ensure reliable water distribution. • Directed the installation of product pipes using auger boring methods in mixed soil types, maintaining accurate grade and alignment for efficient water transport. • Oversaw the hiring and operation of pumps (4000 ltr./hour capacity) and mobile cranes, ensuring efficient removal of water and handling of heavy materials for water resource projects..
• Managed and reviewed 100+ RFIs, Submittals, and shop drawings, ensuring 100 percent compliance and accuracy, maintaining project specification integrity. • Implemented a streamlined process for tracking and documenting change orders and directives, reducing administrative errors by 15 percent and improving overall project efficiency by 10 percent • Diligently updated and managed project schedules collaborating closely with subcontractors for efficient progress and on-time completion. • Scheduled regular meetings with subcontractors to review progress against milestones, resulting in a 20 percent increase in communication and reduction in project delays • Acquired knowledge in managing change orders and directives, adeptly navigating project updates to maintain seamless continuity and integrity
• Project: Construction of a 12.375 km elevated extention of line 8 Delhi Metro, stretching from vikaspuri ramp to Haiderpur-Badli Mor Station, New Delhi, India, with a project cost of Approx. Rs 240 Cr. (40million CAD) • Performed Detailed Quantity take offs for concrete consumption Qty., Transit Mixer output, Labor Calculations and total cost of employees for the whole project • Increased tender submission quality by meticulously evaluating drawings, Specifications, and contracts, leading to a 60 percent win rate. (i.e 3 out of 5 submitted proposals) for the subcontracted projects by the venture, especially for steel girders and their fabrication.