Switzerland
Seasoned professional with a wealth of experience in leading complex engineering projects, specializing in geotechnical and civil engineering operations. Expert in strategic project execution, meeting highest HSE standards. Proven track record in innovative problem-solving, effectively bridging gap between engineering design and practical realization. Skilled in fostering stakeholder relationships, ensuring client satisfaction, and contributing to market expansion. Committed to enhancing team productivity and project management through continuous improvement and fostering collaborative, sociable work environment. Multilingual with fluency in Dutch, German and English.
CIVILXPERT provides indepent projectmangement on complicated Civil - and Ground engineering projects around the world.
One of the world’s biggest and most complex construction projects for international cutting-edge research. On a site of approximately 20 hectares, unique buildings are being constructed in order to house and operate newly developed high-tech research facilities. This Multibillion and highly complex mega construction project has entailed the development of integrated construction workflow planning that closely coordinates building, civil and construction engineering, accelerator development and construction, and scientific experiments. In my role as Project Manager and Client Representative for the civil and infrastructure aspects of the FAIR project, I was deeply involved in integrating various engineering disciplines to meet the unique requirements of constructing such an advanced research facility. At FAIR, I have successfully managed all infrastructure, civil and ground engineering, reinforcement and concrete, roofing, steel, cladding, dewatering and waste water systems, air and electrical piping and shaft, landscaping, outdoor facilities and road works.
Remediation works crude oil storage tank T-5008, Compensation, Fill- and Cavity grouting under an 80 m diameter and 20 m high storage tank at Halul Island, Qatar (offshore). 21.000 m of drilling and 3200 m3 volume of grout being executed in day and night shift up to 60 people workforce on site working together with our Austrian intercompany grouting experts. Responsible for project- and site management, method statements, HSSE-plan, ITP-plan, Weekly and Monthly reporting to general management, Weekly meeting with main contractor and client (on– and offshore), claim management and general correspondence, invoicing and the designing of grout concept.
Working as a subcontractor responsible for all injection works at the Greenline Metro, executing: - Fissure grouting (calcarenite / flint) of 18 crosspassages with a high permeabilty caused by under water table located cavities (200 - 750 l/sec) - Cavity injections for two shafts (approx. 50x60x40 m) creating a resin shield around the shaft and a zement injection for the soil. - Crackrepiar of 36 km of tunnel using double component resin. All works executed with German expats and local work man. Team size up to 30 - 40 person 6 days a week in day and night shift. Under my responsibilty following works are executed: - Design: In contact with our technical department in Germany, Munich creating the design to have the most succesfull injection, - Contract: Discussing the final contract with the legal department, contract management and the client, - Communication: Setting up work method statement, daily reports, quality plans/ control and following up HSSE, workplanning and scheduling due to several locations, - Environment: Setting up whole climated workshops for pump repair and storage all parts required for grouting, - Material/ equipement and spare parts ordering while being in contact with all distributors in Germany, the Netherlands and Sweden - Testing: Setting up all labotory testing of different cement types to come to the final mixture in cooperation with BASF, - Billing and invoicing, - Visa process of the expats and accomodations.
- Realisation extension main office of Gebr. Heinmann in renowned Hafencity in Hamburg, Germany
Aquisition and Calculation on all special ground engineering projects on the Dutch market. - Realisation: Multimillion Euro tunnelproject a2venue, Maastricht, the Netherlands - Aquisition, negotiation and realisation: Multimillion Euro underground parking, Centrumplan aan de Kei, Valkenburg, the Netherlands