Dilip G.

Experienced in Project Management, Project Procurement and Plant Operation in Oil&Gas,Chemical,ASU,PG&P,Water Treatment sector.

Kolkata, West Bengal, India

About

Experience

  • Engineering Manager at Air Liquide
    Dec 2024 - Present · 1 yr 7 mos

    Project Engineering Leadership: Provide comprehensive technical direction across process, mechanical, electrical, and instrumentation disciplines to ensure seamless design integration. ● Technical Specification: Lead the specification and evaluation of critical ASU equipment, including Main Air Compressors (MAC), Expansion Turbines, Cold Boxes, and Distillation Columns. ● Business Development (Parallel Role): Support strategic growth by identifying technical value propositions for new bids, conducting feasibility studies, and aligning technical solutions with client-specific project requirements. ● Risk & Quality Management: Facilitate HAZOP studies and 3D model reviews; lead technical risk assessments to ensure the reliability and safety of cryogenic operations. ● Milestone Management: Collaborate with the Project Manager to align engineering deliverables with budget constraints and global project schedule

  • Principal Project Engineer at Wood
    Nov 2023 - Dec 2024 · 1 yr 2 mos

     To lead the project, present project status, critical issues, mitigation / action plans to client and management.  coordinating all activity with client, onsite team and with offshore team.  To provide supporting function in Procurement and Construction interfaces / interdependencies  To establish execution plans, project specific procedures, and ensure they are implemented within teams.  To manage and lead multi-discipline Engineering Teams  Responsible for Cost, Schedule, quality and HSES requirements of the project  To ensures the project Quality Management System supports deliverables preparation and method of execution.  To participate in design reviews such as HAZOP, 3D models of Plant & packages.

  • Program Manager at L&T Technology Services
    Aug 2022 - Dec 2023 · 1 yr 5 mos

     Responsible for coordinating of all activities with clients, onsite teams and offshore teams.  Responsible for weekly and monthly project progress report, identify bottlenecks, if any take corrective actions.  Responsible for review of all deliverables prior to submission to client to ensure quality and timely delivery.  Instrumental in coordinating all activities in the project with concerned disciplines.  Responsible for providing solution to design problem, queries raised by clients and obtaining approval for deliverables from client/consultant.  Accountable for developing and implementing best practices and SPOS to achieve organizational excellence and resulting in reduction in execution time.  Extended expertise in pipeline for Offshore, Piping and Mechanical system in plant engineering as well as underground piping, project planning &Management, client communications and team management.

  • Linde India Limited (Full-time · 11 yrs)
    • Associate Operations Manager
      Oct 2018 - Aug 2022 · 3 yrs 11 mos

       Operation, Maintenance and Commissioning of Air Separation Unit (Oxygen Plant) & PGP (Compressed Medical & Industrial Gas Cylinder filling unit) as team leader.  Revamp of existing plant to increase production capacity.  Review of P&ID, PFD, Plant Layout, Process data sheet, Thermal & Material balance calculation.  Review of Plant 3D Model with Internal discipline.  HAZOP Study.  Review and approval of MOC to change in plant operation.  Procurement of major equipment (Compressor, Pump etc.), bulk materials (Piping Materials, valves etc.) and consumable (Lube Oil, Greasing material, electrode etc.) related to Project and plant operation.  To achieve ZERO incident target with consolidated teamwork.  Liaison with Government authority to renewal Factory license, drug license, Fire license etc. and to comply norms as per pollution control board.  Strategic planning to reduce plant OPEX  Participation in Audit with Third Party in other Linde owned Oxygen plant

    • Senior Engineer-Project & Procurement
      Sep 2011 - Sep 2018 · 7 yrs 1 mo

       Floating inquiry to vendor, data sheet evaluation, technically freezing & commercial negotiation.  Procurement of Compressor, Pump, Valve, Steam Heater/Electric Heater, Air Filter, Heat Exchanger, chemicals, consumables etc.  HAZOP Study & 3D Model review.  Review of Plot plan, P&ID, PFD, Process Data sheet.  Review of Thermal rating of Heat Exchanger.  Review of Pump’s NPSH Calculation, Safety Valve Sizing Calculation, Line Sizing  Review of Interlock description and Plant operation & maintenance manual preparation  Mechanical & Civil contractor finalization for site work.  Vendor development.  Monthly Project Progress report preparation.  Drawing & Document list preparation and submission to PMC/Client for approval.  Co-ordination with Client/PMC, Internal Discipline, Third Party Inspection Agency.  Project Cost optimization.

  • Manager at Reliance Industries Limited
    Sep 2007 - Sep 2011 · 4 yrs 1 mo

     Operation, Maintenance and commissioning of Hydrogen PSA,Air Separation Unit (Oxygen Plant), ETP, DM,RO and Nitrogen plant.  Execution of project in Hydrogen PSA,Air Separation Unit (Oxygen Plant),ETP, DM,RO and Nitrogen plant.  Active participation in HAZOP Study.  Review on Plot Plan, PFD,P&ID, Process data sheet, Heat & mass balance calculation etc.  NPSH calculation, safety Valve sizing & Line Sizing, Interlock description preparation, SOP & SOC preparation.  Work Permit issuance through SAP system.  Vendor development, Vendor Negotiation & vendor payment