Austria
- HEPP Bärenwerk, 3,8m TBM, 3km incl. prestressed Innerlining; 20 Mio Eur - Lehnenstollen, 1075m Watergallery incl. Fullroundinnerlining; 10 Mio Eur - Perjentunnel, 3km NATM incl. Innerlining; 62 Mio Eur - Scharnitz bypass, 1km NATM incl. Emergency Gallery; 25 Mio Eur, - Semmering SBT 3.1 Grautschenhof, 2x100m shafts DM 14m and 8m, 14km Railwaytunnel NATM incl. drilling and grouting works and Innerling; 300 Mio Eur - HPP Limberg III, TBM + inclined TBM shaft, NATM caverns + concrete works - Kaprun 29, 5,5km TBM + NATM galleries and cavern + shaft - Brenner base tunnel Lot H53: 15km TBM DM 10m + 10km NATM + concrete works, 959 Mio. € - Department Raiseboring international - Department Electrical and Mechanical equipment - Department Railway Construction - Slab Track
- Vadlaheidi Tunnel, Akureyri-Iceland, Roadtunnel L=7,2km; NATM, 60 Mio Eur. - Tunnel Snekkestad, Holmestrand-Norway, Railwaytunnel L=2km; NATM, 60 Mio Eur. - Solbakk Tunnel (Ryfast), Stavanger-Norway, Roadtunnel L=2x8,5km, 170 Mio Eur. - Mangdechhu HEP 720 MW, Bhutan, Headracetunnel, 10km, NATM, 30 Mio Eur - Tunnel Nordnes, Nordnorway, 5,8km NATM Tunnel, 60 Mio Eur
- EKS Kramertunnel, Garmisch-Germany; 3,6km; NATM, 25 Mio Eur.
- Tunnels M6, Motorway M6/M60 Szekszard-Pecs, Hungary, 4 Tunnels, 2 tubes, total lengths: 6,2 km, 120 Mio Eur. - Tunnel Javorova Kosa II, Motorway Zagreb-Rijeka, Croatia, Tunnel L = 1,5km, NATM, 22 Mio Eur
- JV EKT Paierdorf (ÖBB Koralmtunnel); total lengths 5,6km; NATM; 56 Mio Eur. - JV Schutterstollen Taglesberg (Wienerwaldtunnel); L=508m; 31%; NATM; 3 Mio Eur.