Lake Charles-Jennings Area
Professional, static equipment specialist experienced in dealing with all aspects of pressure equipment integrity and reliability issues. Mechanical Integrity Manager with over 25 years experience in the Refining and Petrochemical Industries. Experience in commissioning and start up activities on EPC projects as well as from a Refinery Operations background. Subject Matter Expert in the Inspection/Reliability field, covering ASME, ASNT, API, NBIC; all codes of original construction design as well as run and maintain repair codes in the Oil and Gas Industry. API 510 (21717), API 570 (22342), API 653 (23962).
Assigned as Fixed Equipment Manager after commissioning and turnover activities. Responsible for all regulatory and company compliance mandates with regards to pressure equipment, piping and above ground storage tanks.
Assigned as Quality Assurance Manager during KBR's construction of new Ammonia Plant in Waggaman Louisiana. Worked with KBR Quality Manager and Commissioning personnel in all phases of construction, witnessing and turnover processes.
Mechanical Integrity Coordinator for pressure equipment, process piping and above ground storage tanks for Dyno Nobel manufacturing sites in North America. Involved in turnaround planning of fixed equipment and all aspects of repairs during scheduled and unscheduled outages. Review of inspection test plans and risk based inspection methods on all static equipment at the NA manufacturing locations and initiation sites.
Division Manager of the Sulphur, Lousiana office for All-Tech Inspection. Responsible for budgets, forecasting, turnaround staffing and operational activities out of the office. Interfaced with clients across the Gulf Coast to supply visual and NDE inspection coverage during on-stream and outages.
Fixed Equipment Area Inspector for the Refining and Synthesis production units along with the intermediate tank farm. Supervised and directed contract inspection personnel at the Sabine River Works Complex. Planned and executed fixed equipment inspection and repair activities during the 2009-2010 plant wide turnaround.
Contract Area Inspector at the Philadelphia PA, and Eagle Point Sunoco Refineries for Code Inspection and Testing Co.