Dennis Patrick Ogbeide, .

Technical Renewable Energy Expert

Lagos State, Nigeria

About

With multiple years of experience in the energy sector particularly the renewable energy sector, I am a passionate and driven VP Technical at Rensource Energy, a leading provider of distributed energy solutions in Nigeria. I lead the engineering and project teams that deliver innovative and cost-effective solar hybrid solutions for commercial and industrial clients across the country A dedicated and enthusiastic person with the proven ability to provide comprehensive support to clients and colleagues. Possesses excellent interpersonal skills and the ability to communicate and negotiate concisely at all levels with a friendly mannerism, outgoing and self-confident personality I have the aptitude to work successfully as an individual and as part of a team. I work effectively under pressure demonstrating flexibility within a working environment. I am quick to grasp new ideas and technologies with the ability to develop creative and innovative solutions to problems. I work very closely with the executive team and external Financial partners. I have a willingness to learn and continually improve my skills to date and enjoy challenging working environments.

Experience

  • Senior Technical Associate at All On
    May 2024 - Present · 2 yrs 3 mos

    At All-On, I strategically support the evaluation of Solar renewable energy, and gas-based technologies for investment consideration. I provide technical guidance to All-On and its portfolio companies, reviewing technologies to be deployed for on and off-grid renewable energy solutions making an impact on the unserved and underserved communities in Nigeria. Additionally, I assist in deal delivery by assessing investment opportunities and conducting detailed technical due diligence.

  • VP Technical (Head of Engineering & Projects) at Rensource Energy
    Jul 2018 - May 2024 · 5 yrs 11 mos

    Recent Commercial & Industrial Renewable Energy Projects Delivered -704kWp PV-Generator Hybrid Solution: Premium Poultry Farms, Abuja FCT -120kWp PV-Generator Hybrid Solution (POC) Phase 1, Phase 2: 1.28 MWP Kwara State -300kWp PV-Generator Hybrid Solution, Kaduna State -Over 6MWp of prospects at various stages of technical evaluation/design for 2022/2023 ■ Delivered various renewable solar projects (listed above). ■ Manage the Project and Engineering teams which carried out the energy audits, systems design, and deployment for our clients ■ Work closely with the Business Development team on all potential projects, in-country and out for 2022/23 to achieve a 30-40 MW project pipeline. ■ Review EPC vendors and carry out technical assessments of vendors for selection on EPC contracts. ■ Create scope of works, engineering, and project management requirements for EPC contracts. ■ Led the Engineering team on various ongoing solar Energy Projects, with over 2MWp installed capacity. ■ Oversee the Commercial & Industrial energy/site audit team, and collaborate with the business development manager on strategies and potentials of C&I prospects. ■ Collaborate with the Business Development team during client meetings, explaining to clients how our proposed technical solutions work. ■ Review & approve design documentation and drawings i.e., energy simulations, site, and equipment drawings. ■ Follow up with technical partners and vendors ensuring products and services are to our specifications. ■ Review and guide site construction activities, and follow up with lead site engineers. ■ Provide mentorship to junior engineers. ■ Update management on projects’ technical progress. ■ Carry out site inspections and review project progress. ■ Review respective project schedules with various project managers. ■ Liaise with the in-house supply chain department and collaborate from a technical point of view to ensure the right technical materials, equipment and vendors are selected.

  • Technical Manager at Concept Nova
    Jun 2016 - Jul 2018 · 2 yrs 2 mos

    ■ Provide technical direction for the design, development and systems integration for client engagement from definition phase through implementation. ■ Apply significant knowledge of industry trends and developments to improve service to our clients. ■ Communicate effectively with teams and clients. ■ Interface with the marketing and strategy department, provide updates on current solutions being researched/ undergoing field trials. ■ Review work carried out by various teams (R&D, Software development and Implementation team). ■ Recognize system deficiencies and implement effective solutions such as work process flows. ■ Attend to technical issues arising from the deployment and installation team. ■ Develop custom solutions for our potential customers via R&D. ■ Mentor young engineers, provide direction and scope, match project tasks with opportunities for development so that employee potential is utilized to the maximum. ■ Delegate and allocate responsibilities efficiently to manage projects end to end. ■ Ensure technical teams are contributing and updating our processes and procedures. ■ Encourage team interaction, boost employee motivation and appreciate team contribution, ■ Guide the R&D team in selection of instruments; level gauges (capacitance probes), ultrasonic radar gauges, RTU’s (Remote Terminal Units, and general M2M devices. ■ Calibrating devices, creating calibration chats and testing all instruments, integrating instruments onto the web based platform before deployment of solutions for the clients. ■ Review all engineering documents, review test procedures, test reports, progress reports and create necessary reports to management.

  • Project Coordinator / Lead Electrical Engineer at SJV Global Systems ltd
    May 2015 - Jan 2016 · 9 mos

    ■ Attended client meetings with project team members and assist with the determination of project requirements. ■ Assisted the Project Manager in the drafting and issuance of project proposals. ■ Tracked the progress and quality of work being performed by 3rd party contractors. ■ Effectively and accurately communicate relevant project information to the client and project team. ■ Prepared daily progress reports which were sent to the clients daily. ■ Kept the Project Manager and others informed about project status and issues that may impact client relations. ■ Met with client representatives on site and interfaced with discipline leads. ■ Ensured clients’ needs were met in a timely and cost-effective manner. ■ Reviewed documents pertaining to the electrical works, created work packages, reviewed timelines and schedules with the Project Manager. ■ Created MTO’s and product specifications for purchased (electrical works). ■ Designed the helipad FATO & TLOF perimeter lighting installation procedure and associated helipad equipment embedded in the concrete helipad. ■ Assigned tasks and supervised electrical technicians carrying out all electrical works. ■ Followed up on the works being done at the fabrication yard.

  • OBAX Worldwide Ltd. (3 yrs 5 mos)
    • Lead Electrical & Instrumentation Construction Engineer
      Jan 2012 - Dec 2014 · 3 yrs

      OVADE OGHAREFE GAS PLANT PROJECT – PHASE II ■ Planned, organized, implemented, and coordinated the electrical and instrumentation construction aspects of the $160 million Gas Handling Facility project. ■ Managed staffing and direct supervision of all technical and support personnel. led a team of 15 between the main & field offices. ■ Created daily and weekly work plans to be carried out on-site by myself and supervising engineers. ■ Managed interface between various disciplines (civil, mechanical, electrical, etc.) involved in the project lifecycle. ■ Maintained overall project schedule, fast-tracked project tasks to meet client target completion dates (electrical and instrumentation works). ■ Defined and developed engineering work scopes, justification basis, and engineering surveillance plan. ■ Sourced and selected subcontractors, developed technical contract documents, effectively minimize change orders and project slippage with the project manager. ■ Reviewed project documentation and drawings, inspected construction progress, and issued status reports to the project manager. ■ I was engaged with project team building/progress meetings and ensured all team leads were aware of respective deliverables to be executed accordingly. ■ Prepared weekly progress reports on key weekly deliverables to management and client as a measure of performance against project timeline, scope, and budget. ■ Supervised fabrication of supports for the E&I infrastructure, ensuring fabrication was carried out according to design & specifications. ■ Met daily with client supervisors on site. ■ Always ensured, all members of my team adhered to all HSE rules and regulations.

    • E&I /Assistant Project Engineer
      May 2012 - Nov 2014 · 2 yrs 7 mos

      OVADE OGHAREFE FLOW STATION UPGRADE PROJECT ■ I was the support Engineer to the Project Manager. Assisted in developing, implementing, and managing the construction operations of the client's $1.6Million Crude Oil Flow Station facility. ■ Carried out facility verification as regards electrical and instrumentation (E&I) works before the commencement of the project. ■ Supervised mechanical fabrication relating to E&I works, ensuring fabrication carried was according to design and specifications. ■ Reviewed documents and drawings with the mechanical and civil lead engineers ensuring compliance with project and design specifications. ■ Followed up with clients and technical partners on requisitions, long lead time items, and other miscellaneous matters to keep up with the project schedule. ■ Created quarterly budgets for the E&I aspect of the project. ■ Planned and carried out the electrical and instrumentation construction week to week. ■ Met with client supervisors daily on-site. ■ Always ensured all members of my team adhered to all HSE rules and regulations

    • E&I Engineer
      Feb 2012 - May 2012 · 4 mos

      FLARE RELOCATION, OVADE OGHAREFE FLOW STATION / GAS PLANT PROJECT ■ Supervised a team of 8 members from the installation to the commissioning of the smokeless flare system. ■ Planned and coordinated the installation of flare ignition junction boxes, thermocouple cables and sizing and installation all power cables. ■ Interfaced with the mechanical department to ensure all the piping for the fuel gas was correctly installed. ■ Ensured all the necessary cables were connected and terminated correctly as per design. ■ Performed the commission with equipment vendor representative.