Saint-Légier-La Chiésaz, Vaud, Switzerland
Industrial Manager with more than 16 years of experience in the mechanical industry and the management of complex projects. Throughout my career at Bombardier, Alstom and, more recently, at Services Industriels de Lausanne, I have developed strong expertise in team leadership, continuous improvement and operational performance management. I particularly enjoy working in demanding environments where quality, innovation and people development are key drivers of collective success. Curious and passionate about precision mechanics, I recently completed a continuing education program in watchmaking at the Battenberg Foundation to broaden my skills and explore new professional opportunities.
• Coordination and management of medium and low voltage electrical projects (MV/LV). • Ensuring project delivery within defined timelines, budgets, and quality standards. • Leading and overseeing all operational activities within the unit. • Managing and developing the unit’s human resources. • Driving and supporting cross-functional and strategic projects. • Providing operational support to senior management, including process development and performance monitoring through KPIs. Training followed: - Being an SiL Ambassador - Collaboration interview : keys of success - Awareness of Hybrid Management - Best electrical practices - SiL Project Management - Module 1 and 2 - Public markets - Leadership Passport Module 1 and 2 - Leadership Passport - Psychological climate - Leading a cross-functional or project team - Emergency measures - First aid and fire extinguishing awarness - Workplace harassment : Let's dare to talk about and act - for managers
• Understand the detailed functioning of the kitchen system. • Referent and decision maker for modifications and improvements of the vehicle restaurant. • bResolve reliability and non-conformity problems of the vehicle (piping, electrical, mechanical, functional). • Ensure the proper functioning and maintenance of the restaurant vehicle. • Manage the obsolescence of the restaurant vehicle equipment. • Manage contact with suppliers and the end customer. • Manage the stakeholders on the restaurant vehicle interventions.
Support and coordination of validation tests of technical solutions (proposed by ENG) on vehicle. • Support the ENG team in prototyping and testing solutions on trains. • Coordinate the various interlocutors and ensure the presence of the equipment and the vehicle necessary for the smooth running of the tests. Investigation and proposal of technical solutions to the problems reported by SBB (via meeting collocation), PI / QA (via MAP meeting) and the purchasing department. • Investigation, validation of the solution, • Creation of the documentation and writing of the Change Request for implementation. Responsible for the mechanical reliability points of trains in operation. • Recovering customer points of mechanical unreliability • Analysis of points of unreliability • Proposal of a solution to resolve the points • Creation of Change-Request • Following the Change-Request's application on the retrofit
Responsible of Quality Production on the head vehicle line and management of teams, Site Villeneuve for Twindexx SBB FV Dosto Project
Team leader of Production Support team in Methods Electric service
- Engineering Support in production, problems analysis and transfer modification to Engineering department- project Dosto Twindexx. - Modification of tree structure and drawing of family compartment assembly plans - Dosto Twindexx project. - Relay between the purchasing department - the suppliers and the engineering on the technical questions related to the realization of the parts ordered by the purchases - project Dosto Twindexx.
Processing of modifications requests on the NTV project on the interior layout of the train.
• Detailed design of fluid filling equipment on automobile assembly lines, construction machinery and trucks. • Preliminary design, detailed prototype tooling for dishwashing tests for an American subsidiary of the CINETIC FILLING group. • Detailed design of standard components (fluid reservoir, adapter, hang-up ...)
• Preliminary design, detailed and pre-series of an engine block, modification following functional evolutions, and malfunctions of manufacture and assembly. • Development of the winterization kit of the electrical cabinet of a motor cabin, and assembly of a prototype on a cabin cabinet. • Preliminary design, detailed and pre-series on a traction box, inverter box and high voltage box, modified following functional evolutions, and malfunctions of manufacture and assembly.
• Internship at the end of the Bachelor's degree at the engineering department, realization of a methodology for modeling and parameterizing CAD sanitary cabins in polyester, and their manufacture in CAM to the final product.