DEBANANDA PATRA

NHSRCL | HSR | Metro | DFCCIL | Indian Railways | Elevated Bridge | Viaduct Bridge | Bridge-Structure | CAD Technician | Draughtsman-Civil

Kolkata, West Bengal, India

About

15 Years of Working Experience in Railway/Bridge/Buildings Structure Engineering, Commercial & Residential Building Drawing Plan, Section, Elevation and RCC details etc. 1. Prepare of General Arrangement drawing & Structural Reinforcement detailing for IMB, MJB, MJRUB, MIB, Box culvert, Pipe culvert, FOB, RFO, PS, Retaining wall, Wing Wall etc. 2. Prepare of Bar Bending Schedule & Concrete quantity calculation for IMB, MJB, MJRUB, MIB, Box culvert, Pipe culvert, FOB, RFO, PS, Retaining wall, Wing Wall etc. 3. Prepare of Layout Plan for different RCC Structure such as Important Bridge, Major Bridge, Road under Bridge, Minor Bridge and Culverts for execution of work at site. 4. Prepare all types of structure (Foundation, Sub Structure & Super Structure) & infrastructure drawing to using Auto-CAD 2020. 5. Coordinate for structural Bridges, Buildings drawing works. 6. Prepare of as built drawing for Railway, Drainage plan & profile, cross section, as executed at site for final submission to the client. 7. Prepare layout plan, laying printing technology, manage plotter, and ensure quality prints and drawing index etc. 8. Prepare miscellaneous drawing as per site requirement. Software Skill: AutoCAD-2D & 3D (2020), Revit (Beginner), Photoshop, Ms-office Tools, Adobe Acrobat Tools.

Experience

  • Senior Draughtsman at Shapoorji Pallonji - Engineering & Construction (SP E&C)
    Dec 2023 - Present · 2 yrs 7 mos

  • Sr. Draughtsman-Civil (Structure) @ India's 1st Mumbai-Ahmedabad High Speed Rail at DRAIPL
    Jun 2022 - Dec 2023 · 1 yr 7 mos

  • Civil Drafter at Dineshchandra R. Agrawal Infracon Private Limited
    Jun 2022 - Dec 2023 · 1 yr 7 mos

    (NHSRCL) Mumbai-Ahmedabad High Speed Rail Project (Package No. MAHSR-C-7) Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Ahmedabad Station, Sabarmati Station, Viaduct & Bridges, Crossing Bridges (excluding fabrication and transportation of steel truss girders) and Associated works between MAHSR Km. 489.467 and MAHSR Km. 507.599 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.

  • KEC International Ltd. (4 yrs 4 mos)
    • Draughtsman-Civil
      Mar 2018 - Jun 2022 · 4 yrs 4 mos

      1. Project : Northern Railway (Ambala Division) Client : Rail Vikas Nigam Limited (RVNL) 2. Project : West Central Railways (Bhopal Division) Client : RITES

    • Civil Drafter
      Mar 2018 - Jun 2022 · 4 yrs 4 mos

      NORTHERN RAILWAY (AMBALA DIVISION) RAIL VIKAS NIGAM LIMITED Package No.3 (RBD-3) - “Construction of Roadbed, minor bridges, supply of ballast, Installation of track (excluding supply of rails, PSC sleeper & Thick web switches), Electrical (Railway Electrification and General Electrification), Signaling and Telecommunication works for Doubling of track between Hadiaya (Excluding) and Bathinda from km 115.64 to 172.64 (57 Km) in Ambala Division of Northern Railway, Punjab, India.

  • Tata Projects (1 yr 4 mos)
    • Draughtsman
      Dec 2016 - Mar 2018 · 1 yr 4 mos

      Project : Dedicated Freight Corridor (Western Corridor) Client : DFCCIL (Dedicated Freight Corridor Corporation of India Limited)

    • Drafter
      Dec 2016 - Mar 2018 · 1 yr 4 mos

      DFCCIL (Western Corridor) Design and Construction of 131 Km includes Civil, Structures and Track Works for Double Line Railway Involving in Embankments/Cuttings, Ballast on Formation, Track works, Bridges, Structures, Buildings, Including Testing and Commissioning on Design-Build Lump Sum Basis for Sachin-Vadodara Section of Western Dedicated Freight Corridor- Contract Package : CTP:13