Greater Hamburg Area
Asset Management, Operation and Maintenance - Leading the team of "Technical Project Managers", "Offshore Site Managers" and "Operations Engineers" - Structuring and execution of the Operational Preparation and Operational Implementation Phase of the Veja Mate Offshore Wind Farm to the Operation and Maintenance Phase including - Hand Over- Take Over from EPCI packages - Tendering and Contract negotiations of Balance of Plant (BoP) Service Contracts - Contract execution of WTG and BoP Service contracts - Subcontrator Management - Claim management - Asset Lifecycle Management - Set-up of court-proof organization structure including Lead Senior Authorized Person (Lead SAP) "verantwortliche Elektrofachkraft" (vEFK), HSE Management "Fachkraft für Arbeitssicherheit" (FaSi), etc. - Hiring strategy and employee profile development - Search and hiring of permanent employees for Veja Mate - Risk Management including take over Risks from EPCI phase - Process framework development and Management - Project Management - Development and implementation of Maintenance strategies - Periodic Inspections and reporting to authorities (BSH) - Moderating stressful situations - Being diplomatic
Department Environmental, Health- and Safety, Quality Management and Business Improvement: - Responsible for On- and Offshore Wind Parks in EMEA Service - Specialist for "Control of Hazardous Energy" including “Electrical Works“ (Low and High Voltage), according to e.g. EN 50110-1, DIN VDE 0105-10, DIN VDE 1000-10 (verantwortliche Elektrofachkraft) and Siemens internal regulations. - Medium- and High voltage switching authorization "Senior Authorized Person" (SAP) - Manager for development and implementation of standardized Permit to Work (PtW),Safe System of Work, Control of Hazardous Energy (CoHE) / Lock Out/Tag Out (LOTO) systems. - Working in and leading of interdisciplinary and intercultural teams - Consulting of EMEA and Global management - Implementation of ISO 14001, ISO 9001 and OSHAS 18001 and corporate EHS principles. - Post merger integration, change management, continuous improvement
Working as Engineer and developing of Master-Thesis: Project management and layout development of High Voltage Direct Current (HVDC) transmission offshore substation standardization. - Technical layout development of new platform designs regarding High Voltage installations up to 320kV, mechanical facilities and structural design. - “Hazard Identification Studies” (HAZID) - “Failure mode and effects analyses” (FMEA). Title of Master-Thesis: Development and evaluation of a modular design concept for standardization of HVDCT offshore converter platforms
- Script based simulation method development in MATLAB/Simulink and PowerFactory - Simulation modell developement and simulation of wind turbine Drive Train; Generator and Converter, Transformer - High, Medium and Low voltage electrical grid integration and short circuit simulation - Wind Turbine technology market research - Representation of the Institute at public events