DANIEL RASQUINHA

ARAMCO APPROVED 2ND ENGINEER-DP2/DP3 CABLE &UMBILICAL LAY,CONSTRUCTION,SURF, ACCOMMODATION, SATURATION & AIR DIVE , ROV VESSELS HAVING OPITO-FOET

Goa, India

About

ARAMCO APPROVED SECOND ENGINEER-OFFSHORE DP2/3 CABLE & UMBILICAL LAY/DSV (SATURATION & AIR DIVE)/ROV/MPSV/CONSTRUCTION SUPPORT VESSELS WITH OPITO-FOET, DP MAINTENANCE, HIGH VOLTAGE (MANAGEMENT LEVEL), ENGINE ROOM RESOURCE MANAGEMENT (MANAGEMENT LEVEL).

Experience

  • 2ND ENGINEER-DP3 DIESEL ELECTRIC, MPSV/ROV at BOURBON OFFSHORE SURF
    Dec 2025 - Feb 2026 · 3 mos

    Accommodation for SBM Offshore crew of FPSO Saxi Batuque & FPSO Mondo CLIENT- ESSO EXPLORATION ANGOLA CHARTERER-SBM OFFSHORE, HOLLAND

  • POSH Saudi Co. Ltd. (On-site)
    • 2ND ENGINEER-DP2 SAT & AIR DIVE, ROV VESSEL
      May 2025 - Sep 2025 · 5 mos

      Subsea inspection, maintenance & repair activities CLIENT-ARAMCO CHARTERER-ZAMIL MERMAID

    • 2ND ENGINEER-DP3 OFFSHORE CONSTRUCTION VESSEL
      Mar 2025 - May 2025 · 3 mos

      Installation of subsea umbilical riser and flowline of CRPO 117-118-119 Pre-lay/as-laid/as-built survey, flexible & umbilical installation, laying of composite(high voltage DC+ fibre optic) cables CLIENT-ARAMCO CHARTERER-LARSEN & TOUBRO HYDROCARBON ENGINEERING

  • 2ND ENGINEER-DP3 OFFSHORE CONSTRUCTION VESSEL at POSH Fleet Services
    Dec 2024 - Dec 2024 · 1 mo

    Installation of steel tube flying leads, electrical flying leads, subsea distribution unit, umbilical termination assembly, pig launch/recovery-installation and recovery CLIENT-ONGC CHARTERER- J RAY McDERMOTT

  • 2ND ENGINEER-DP3 OFFSHORE CONSTRUCTION VESSEL at POSH Fleet Services
    Oct 2024 - Oct 2024 · 1 mo

    Installation of steel tube flying leads, electrical flying leads, subsea distribution unit, umbilical termination assembly, pig launch/recovery-installation and recovery CLIENT-ONGC CHARTERER- J RAY McDERMOTT

  • NMDC Group (On-site)
    • 2ND ENGINEER-DP3 CABLE LAY VESSEL
      May 2024 - Aug 2024 · 4 mos

      CONSTRUCTION,WELL SUPPORT ACTIVITIES CLIENT/CHARTERER-ADNOC

    • 2ND ENGINEER- DP3 CABLE & UMBILICAL LAY VESSEL
      Jan 2024 - Apr 2024 · 4 mos

      LAYING OF COMPOSITE (HIGH VOLTAGE DC + FIBRE OPTIC) CABLE IN ARZANA FIELD,ABU DHABI

    • 2ND ENGINEER- DP3 CABLE & UMBILICAL LAY VESSEL
      Sep 2023 - Dec 2023 · 4 mos

      LAYING OF COMPOSITE (HIGH VOLTAGE DC + FIBRE OPTIC) CABLE IN ARZANA FIELD,ABU DHABI