Burak D.

Component Owner - Traton Group

Stockholm, Stockholm County, Sweden

About

Experience

  • TRATON GROUP (Södertälje, Stockholm County, Sweden · On-site)
    • Component Owner, Charging and Power Distrubition
      Oct 2025 - Present · 9 mos

      I continue with the same role as I was having in SCANIA CV AB. Now the R&D section is a part of TRATON in global.

    • Development Engineer for Service
      Jul 2025 - Oct 2025 · 4 mos

  • Scania Group (Full-time · 3 yrs 4 mos)
    • Development Engineer for Service
      Mar 2024 - Jul 2025 · 1 yr 5 mos

      Energy Storage and Charging, Service Information

    • Global Process Engineer
      Apr 2022 - Mar 2024 · 2 yrs

      -Giving input to R&D in early product development phase regarding identified risks and their impact on production processes, assembly methods and ergonomics. -Proposing global "assembly sequences" for new products as a guideline for Bus Chassis assembly globally. -Identifying investment needs in product development projects in collaboration with local process engineers from affected production units. -Developing prototype tools, fixtures and equipment for "start of production" introduction in final assemblies by collaborating with local engineers from affected production units. -Verifying and quality assure that global element sheets for new assembly follows proposed global assembly sequence before publishing globally in system.

  • MAN Türkiye A.Ş. (Full-time · 3 yrs 8 mos)
    • Senior Pre-Serial Engineer
      Jun 2020 - Mar 2022 · 1 yr 10 mos

      -Managing assembly plans on pre-serial bus projects. -Preparing production plan, assembly tasks and instructions, templates and equipment for all responsible blue-collar employees. -Assigning tasks to colleagues at design, logistics, purchasing to manage pre-serial production properly. -Describing very first assemblies to production line, reporting technical failures to departments. -Improving technical capability of production line for serial production. -Reporting status of the project to upper management at weekly project meetings. -Decreasing the labor hours and cost of vehicle by improving assembly processes. -Responsible for the processes of prototype and mock up vehicles. -Leading design processes with perspective of workability. -Closing open points for production lines before serial production starts. -Identifying root-cause analyses of failures while production. -Attending R&D meetings from beginning to end of pre-serial processes.

    • Quality Gate Engineer
      Aug 2018 - Jun 2020 · 1 yr 11 mos

      -Preparing analyze report for vehicle orders before production starts by checking integrity of complete 3D-Data including customer wishes. -Establishing possible failures of technical work, 2D&3D irregularities and all the BOM (Bill of material) status. -Improving the suitability of all customer wishes in vehicle data. -Reporting technical mistakes to responsible departments which can be occurred in production section. -Weekly organizing 3D-Meeting with all of the responsible colleagues, presenting the analyze report of every bus order. -Checking homologation rules on bus orders.

  • Intern Mechanical Engineer at MITAS CIVATA
    Jul 2016 - Aug 2016 · 2 mos

    -Performing quality assurance test on cold forged bolts. -Improving the technical documentation of molding section.

  • Intern Mechanical Engineer at UYGUR Ltd
    Jul 2015 - Aug 2015 · 2 mos

    -Supporting technical colleague to design frame parts of aircrafts. -Following the all machining processes on milling and turning machines. -Making a quality assurance on milled parts.