Cyril James

PMC SENIOR PIPING ENGINEER at Technip

Faridabad, Haryana, India

About

-Started our Own Production unit in January 2018, where we endeavor to manufacture Automobile Spare Parts. Having more than 39 years of experience of which 25 years in the field of Oil & Gas industry. Worked on various onshore/offshore/floating installation projects for conceptual/basic/feed/detailed design/EPC projects. Specialties: Discipline Job Leader Plot plan development Multi discipline engineering coordination Field Engineering Dealing with various vendors for interfaces FPSO

Experience

  • PMC SENIOR PIPING ENGINEER at Technip
    Oct 2019 - Present · 6 yrs 9 mos

  • Managing Partner at James Technologies LLP
    Jan 2018 - Present · 8 yrs 6 mos

    We are pleased to introduce ourselves as James Technologies LLP, a new entrant to automobile spare parts manufacturing industry. James Technologies LLP is located at Plot no.140, Mauza, Sector-59, Huda Industrial Estate, Tehsil Ballabhgarh, Distt. Faridabad, Haryana

  • Technip (13 yrs)
    • Senior Piping Engineer
      Nov 2013 - Mar 2016 · 2 yrs 5 mos

      ADMA-OPCO is developing several new fields in its offshore concession areas i.e. Umm Lulu (UL), Satah Al Razboot (SARB) and NASR. The new program objective is aligned and integrated with ADMA-OPCO’s mid-term total sustainable production target of 1 MMSTBOPD. Umm Lulu Full Field Development (ULFFD) Project is developed in two phases: Phase –I: Early Production System (EPS) with Minimal Facilities in Umm Lulu Field and processing of Umm Lulu well fluids through 12” trunk line to Umm Al Dalk (UAD) and Zakum Central complex to Zirku Island. Phase –II:Full Field Development (FFD) producing to Zirku Island. Design Coordinator- Working for the development of new Equipment Layout and Piping Arrangements. Review of various vendor proposals received for equipment & packages. Guiding a team of engineers and designers. Solving day to day design problems. Reviewing 3D modelling progress. Providing input to discipline working methodology. Input to basic piping deliverables. Establishing piping working practise. Piping basis of design document. To review other discipline documents such as, PID`s, level studies. Attending review meetings with client. Allocation of work to the team. Attending discipline and project review / co-ordination meetings. Manpower planning and reporting. Attending 3D model reviews. Discussing with various vendors and suppliers. Visiting vendor premises to attend review of vendor packages

    • Lead Engineer- Piping
      Jun 2010 - Oct 2013 · 3 yrs 5 mos

      FPSO P76- CESSAO ONEROSA PROJECT Consultant (Equipment Layout and Piping Arrangement)-DETAIL ENGINEERING PHASE - Review / analysis of responses of technical queries prepared during FEED endorsement. - To orientate / guide team members - To co-ordinate with Other disciplines - Review of vendor proposals Lead Engineer Responsible for FEED ENDORSEMENT To review and validate the Feed Engineering Design performed by others to start with the Detail Design process - Leading a team of Engineers/Designers - To orientate the team members regarding FPSO installations - Help team to analyse module arrangement in terms of Equipment locations/accessibility/operability/ maintenance -To co-ordinate with other disciplines - To prepare technical clarifications & review technical clarifications prepared by others - 3D model review - Input to FEED Endorsement Report FPSO PROJECT FOR PETROBRAS FPSO P58 AND P62 Compression Modules - Lead Responsibilities involve: Design Activities for 4 compression modules each on both P58 and P62 - Leading a team of engineers/designers/PDS designers - Establishing Equipment Layout studies of modules, providing input to other discipline - To establish system for 3d modeling - To plan piping team working schedule - To plan manpower requirement - To discuss with compressor and other vendors for design interface - To comment on vendor drawings - To review piping design using smart plant review - Liaise with other discipline/ Client - Attend co ordination meetings internal / external -Attending Hazop reviews/3D design reviews -To issue piping deliverable PEREGRINO FIELD DEVELOPMENT PROJECT PHASE II (Statoil - Oslo) The Project is to provide conceptual design for WHP that has to be located offshore Brazil Lead Piping - Responsible for Piping activities on the project - Manpower/resources planing - Establishing discipline working schedule - Attending Design reviews/Hazop reviews - Completing piping design dossier - Wellhead layout design

    • Senior Piping Engineer
      Oct 2008 - Jun 2010 · 1 yr 9 mos

      Worked on various offshore and Onshore Project such as: - Canadian Nexen Petroleum- YEMEN Detailed Engineering Services CPP Ruston Modification Project(ONSHORE)- LEAD ENGINEER - Produced Water Separation & Treatment Facilities Conceptual Study- ZADCO(OFFSHORE) - LEAD ENGINEER - Replacement Of Steam Turbo Generators At NO. 2 Power Plant – Bahrain, BAPCO (ONSHORE) - INSTALLATION ENGINEER

  • Lead Designer -Piping at WorleyParsons
    Jul 2002 - Mar 2003 · 9 mos

    Located at Dedicated Design Office in the Premises of Maersk Oil Company Involved in Detail Engineering of Brown Field Development at Al Shaheen Offshore Oil Field in Qatar Projects worked on: - Installation of new crude – oil heaters and new heating medium pumps - Stock tank compressor Responsibilities include: - Defining document index - Piping system by defining tie-ins to the existing Piping System. - Preparation/Checking of the complete design package. - Input to engineering dossier. - Attending meetings internal and with Client. - Offshore survey. - Preparing reports. - To guide a team of designers and CAD operators - Have interface to the existing facilities.

  • Technip (8 yrs 6 mos)
    • Design Engineer-Piping
      Jul 1994 - Apr 2002 · 7 yrs 10 mos

      Involved in engineering activities of: Onshore/Offshore Projects Carried out: Conceptual/Basic/FEED/Detail Engineering Projects Activities carries out: Preparation of Basic Equipment Layout/Plot Plans Piping Layout basic study Leading a team of designers and CAD operators Carrying out offshore/onshore site surveys Supervising Material Take off activities Supervising Isometric checking activities Inter discipline coordination

    • Lead Piping Designer
      Nov 1993 - Jul 1994 · 9 mos

      Worked on VariousOffshore projects for, conceptual, FEED, detailed engineering and EPC that include offshore site visits : IDD EL Shargi North Dome Project -EPS & IFT Works- QP Telemetry Project :- QP, Qatar Transferred to Technip, Abu Dhabi in July 1994