Christian Nevo

Head of Technical Infrastructure Division chez ESRF - The European Synchrotron

Grenoble, Auvergne-Rhône-Alpes, France

About

Project Management Team Management Technical coordination of mechanical, electrical and control fields of activity

Experience

  • Head of Technical Infrastructure Division at ESRF - The European Synchrotron
    Oct 2019 - Present · 6 yrs 9 mos

    - Buildind and Infrastructure - Systems and communications - Management and Information system - Alignment - Vacuum

  • Responsable coordination des offres at GE Renewable Energy
    Sep 2010 - Oct 2019 · 9 yrs 2 mos

    In charge of the tendering integration management team on all large projects for new and installed base. Consolidation of products line: turbine, generator, Electrical and mechanical auxiliairies, control system and hydro mechanical. - Team management - Coordination of : technical solutions, costs, site activity, project schedule - Analysis of costs drivers and revenue streams for project optimisation - Review of overall tendering team loads - Business development in Australia

  • Technical project leader at Alstom Power
    Nov 2007 - Jul 2010 · 2 yrs 9 mos

    Son La Hydropower 6 x 400MW - Vietnam - Customer EVN - Overall technical coordination for the project and in charge of the technical management for the plant auxiliairies. Coordination with Chinese design institute.

  • Alstom Power (4 yrs 9 mos)
    • Technical project manager
      Jan 2006 - Sep 2007 · 1 yr 9 mos

      Turbine pump plants (PSP) - 4 x ( 4 x 320 MW) - China - Baoquan - Bailianhe - Huizhou - In charge of the Overall technical coordination - Interaction with Chinese design institute

    • Project Manager
      Jan 2003 - Dec 2005 · 3 yrs

      Project Manager for the rehabilitation of Kosovo B thermal power plants (2 x 340MW Brown Coal) - In charge of project management, claim management and technical coordination - FIDIC Yellow book - Control system for the units and field instrumentation - Steam turbine control and monitoring - Boiler and sootblowers rehabilitation & NFPA standards implementation

  • SPIE (Région de Paris, France)
    • Project Manager
      Jul 1998 - Dec 2002 · 4 yrs 6 mos

      Waste incineration plant (France) 2 x 11 t/h - 20MW Steam turbine In charge of project management and technical coordination for Spie scope of supply (plant auxiliaries). – Specification and procurement of major equipment: Main transformers, low pressure heater, deaerator, boiler feed pumps, air compressors, demineralized water unit, high and low voltage switchboards, MCC, inverters, – Piping (steam, water, fuel, compressed air) and electromechanical equipment – HVAC for process areas and electrical rooms – Electrical distribution from 63kV substation and plant control system (DCS) – Plant general arrangement

    • Project Manager
      Jan 1997 - Sep 1999 · 2 yrs 9 mos

      Rehabilitation of Control system and instrumentation for Al Mussaib fuel power plant 320 MW (Irak) - Technical and Contractual follow up of Sub-Contractor (UK) in charge of the engineering and development of the control system (DCS) for the plant and the turbine

    • Project manager
      Jul 1997 - Aug 1999 · 2 yrs 2 mos

      Site Survey and offer for the rehabilitation of Bagdad South units 1 to 6. Coordination with Partner for turbine rehabilitation Technical offer preparation and costing for boiler and auxiliaries (electrical and mechanical)