Chee Wei Choong

Test Process Engineering Manager @ ams OSRAM | Process Engineering

Bayan Lepas, Penang, Malaysia

About

Experience

  • ams OSRAM (9 yrs 10 mos)
    • Test Process Engineering Manager
      Apr 2021 - Present · 5 yrs 3 mos

      Certified Coaching and Mentoring Professional (CCMP), by ITD World

    • Test Process Specialist Engineer
      Jan 2019 - Mar 2021 · 2 yrs 3 mos

      Certified Osram Lean Six Sigma Green Belt

    • Test Process Sr. Engineer
      Sep 2016 - Dec 2018 · 2 yrs 4 mos

  • Sr. Equipment & Process Engineer| Lean Six Sigma Green Belt @ Motorola University at Motorola Solutions
    Nov 2010 - Sep 2016 · 5 yrs 11 mos

    More than 10 technical papers covering topics of Lean Six Sigma, Productivity & SMT Technology; have been selected for showcase and presentation in Motorola Technical Expo. Awarded "BEST PAPER PRESENTATION FOR MANUFACTURING TRACK" : New SMT Equipment (Fuji NXT II) Deployment in Motorola Penang and its Challenges , presented at Motorola Penang Technical Expo 2013. Publications: Choong, C.W, Liang, J.W, Tan, H.C and Nora, A.K (2015). “Fuji SMT debugging capability improvement via NPI tool development”. Poster showcased at Motorola Penang Technical Expo 2015, Motorola Innoplex. Choong, C.W, Liang, J.W, Nora, A.K and Ooi, S.J (2014). “AIMEX 2S: Next generation of Fuji platform in Motorola Penang”. Paper published at Motorola Penang Technical Expo 2014, Equatorial Hotel. Lim, C.S, Chuah, L.H, Tan, S.H, Choong, C.W, Jeremy, K. and Lim, S.K. (2014). “FE zero defect initiative”. Paper published at Motorola Penang Technical Expo 2014, Equatorial Hotel. Low, T.H., Koay, H.S. and Choong, C.W. (2014). “Development of Fuji computer integrated manufacturing system”. Paper published at Motorola Penang Technical Expo 2014, Equatorial Hotel. Azman, M.T., Tan, K.K., Low, T.H., Hazeli, A.K. and Choong, C.W. (2013). “50% Nome manual time reduction through DMAIC”. Paper presented at Motorola Penang Technical Expo 2013, Equatorial Hotel. Kenny, C., Tan, S.H., Lim, S.K. and Choong, C.W. (2013). “Package on Package (POP) process characterization and capability study”. Paper presented at Motorola Penang Technical Expo 2013, Equatorial Hotel. Azman, M. T., Low, T.H., Lee, W.L., Tan, K.K. and Choong, C.W. (2012). “Business Light productivity improvement through Lean Methodology Application”. Paper published at Motorola Penang Technical Symposium 2012, Equatorial Hotel. Choong, C.W., Liang, J.W., Nora, A.K., Tan, H.C. and Ooi, S.J. (2012). “Fuji line setup and implementation in Motorola Penang”. Poster showcased at Motorola Penang Technical Symposium 2012, Equatorial Hotel.

  • Product Engineer at Eng Teknologi Sdn Bhd
    Jul 2009 - Oct 2010 · 1 yr 4 mos