Wilmington, Delaware, United States
Primary activities and responsibilities have been structural drawing production for the new Mariner East 2 gas pipeline on new and existing pipe supports/ pipe racks at the Sunoco Logistics Marcus Hook, Pennsylvania facility. Drawings include plans and details utilizing AutoCAD software generated from field notes, survey data, existing reference drawings and photographs. I work closely with piping designers to verify routing. Additional responsibilities include construction observation, field liaison between the craft and client, attend progress meetings and report issues as they arise. I maintain a TWIC card from the Transportation Security Administration, BOP safety training and site specific safety training.
Greeted clients, showed products, scheduled in home measurements, designed kitchen and bathrooms as requested utilizing 2020 Design software. I presented designs and finalized sales.
Primarily concerned with parking lot drainage, storm water and sewage conveyance and water distribution for subdivision in New Castle County, Delaware using AutoCAD design software.
Opened and closed Showroom daily, greeted customers, showed products, arranged in-home measurements, designed kitchens and bathrooms as requested utilizing 2020 Kitchen Design software, presented designs and finalized sales, contracted and scheduled installers, inspected installation and sought customer feedback, set up displays, cleaned Showroom.