Cem ALTINBAŞ

Electrical-Electronical Engineer | 15+ Years Experience

İzmir, Türkiye

About

I started my business life with two years of project office experience and later on, I had the opportunity to work in important projects by switching to construction applications. During this period, shopping malls, hotels, airports, industrial facilities, hospitals, etc. I have worked on projects. MV-LV systems infrastructure, testing and commissioning Scada system infrastructure, testing and commissioning Weak Current systems (Wire, data, fire, sound, camera systems infrastructure installation, testing and commissioning) BMS system infrastructure, testing and commissioning I have experienced many systems such as air handling units, electrical infrastructure, testing and commissioning. yours truly.

Experience

  • Electrical Site Chef at ASC-OZYEP YAPI TEKNİK
    Mar 2024 - Present · 2 yrs 4 mos

    Electrical site chef at the Trendyol Gebze Logistics Distribution Center construction site. Preparation of MCC panel single-line and loading schedules. Electrical and automation testing and commissioning of mechanical systems. Construction of the site energy center (4x1600 kVA transformers and switchgears), SCADA, medium voltage and low voltage infrastructure manufacturing, and control of panel and field manufacturing. Creation of electrical column diagrams and main loading schedules. Attachment and progress payments. Project drawing - Detail/Section/Asbuilt

  • Senior Electrical Engineer at Gama Türkerler A.O.
    Apr 2022 - Jan 2024 · 1 yr 10 mos

    • I worked as a electrical engineer in charge of the Main Hospital Building (MHC) at İzmir City Hospital. • All strong-weak current manufacturing in the MHC building, control, and entitlements of the relevant manufacturing. .Mechanical automation systems, DDC panels, MCC panels

  • Senior Electrical Engineer at Salini - CCN - ICTAS (SCI JV)
    Jan 2018 - Dec 2021 · 4 yrs

    • I worked as a senior electrical engineer in charge of the Main Hospital Building (MHC) at Gaziantep City Hospital. • All strong-weak current manufacturing in the MHC building, control, and entitlements of the relevant manufacturing.

  • Electrical Site Engineer at AE Arma-Elektropanç
    Sep 2012 - Apr 2016 · 3 yrs 8 mos

    • Electrical design engineer and electrical field engineer in the main terminal building of Pulkovo Airport project in St.Petersburg / Russia. • During the period of work, strong current – weak current manufacturing, control, deserving of related manufacturing.

  • Electrical Site Engineer at Cagla Group Co.
    Jun 2011 - Aug 2012 · 1 yr 3 mos

    • Electrical design engineer and electrical field engineer at Aquarium Mall construction site in Florya / Istanbul. • “Florya Aquarium Shopping Mall” project, strong current – weak current manufacturing and control.