Büşra Nergiz

Industrial Engineer

Ankara, Türkiye

About

Experience

  • Business Analyst at Solvera
    Jan 2025 - Apr 2026 · 1 yr 4 mos

    Responsible for gathering and analyzing business requirements for web and mobile applications, preparing user stories and process flows, conducting functional tests, and ensuring clear and effective communication between stakeholders and the software development team. -Collect and analyze business requirements and prepare analysis documents, prepare Mockup in Balsamiq -Creating requirement documents and defining workflows in Miro -To follow the correct implementation of the requirements by providing continuous communication during the software development process in JIRA -To provide access to accurate and consistent data using MS SQL in reporting and analysis processes. -I conduct Requirements Validation Testing to ensure that implemented features fully meet business needs and functional requirements and prepare Test Case in Folge. - I perform manual API testing in Postman to validate business requirements and ensure accurate system functionality. -Analyzing the test results and determining the necessary improvement and correction actions

  • Project Manager Intern at FabMetrics
    Nov 2024 - Dec 2024 · 2 mos

  • Data Analyst Intern at Eti Maden İşletmeleri Genel Müdürlüğü
    Feb 2024 - Jun 2024 · 5 mos

    -I was working on reducing waiting costs caused by fluctuations in river levels along the route of cargo ships used for mineral transportation, which pass through the Danube River. -In this study, river water level analysis, prediction, and decision support mechanisms, in order to suggest new ways, have been considered at the bottleneck where the problem is observed. -I used the Python for data of river water levels analysis and prediction. After that, I calculated cost for two transportation way via GAMS and used machine learning algorithm for decision support mechanisms (ARIMA with 80:20 training/test ratios).

  • Lean Manufacturing Intern at Çepaş - Gonvarri Industries
    Nov 2023 - Jan 2024 · 3 mos

    -As a result of careful observation of field activities, an improvement plan is proposed to significantly reduce mold change times in the galvanizing process. -With the selected method, it is aim to minimize mold change times and to make the production line more flexible and efficient. -By adopting lean production principles, it is aim to increase the capacity to respond faster to customer demands and minimize waste. -SAP MM module is actively used during the studies.

  • Project Worker | Sustainability at Nurol Teknoloji
    Jul 2023 - Nov 2023 · 5 mos

    -I worked with a team on carbon reduction studies and carbon calculation processes in the defence industry. -Together with my team, we conducted research and presentations on sustainable development goals and green supply chain. -Within the scope of these projects, we evaluated carbon reduction strategies in the defence industry and made recommendations for the development of sustainable practices.